| 2.0 | General Layout | |
|
|
|
|
|
| Layout (Fig. 3) | |
| 2.1 | ||
| 1. | Automatic Air Vent | |
1 | 2. | Flue Connection | |
2 | 3. | Spark Generator | |
| 4. | Spark &Sensing Electrodes |
17
16
15
14
13
12
11
10
PCBControl Box removed for clarity
35. Heat Exchanger
6. Boiler ControlConnector
47. Control Wiring Connector
5
8. Condensate Sump
9.Gas Cock
10.Condensate Pump
11.Fan
12.Drain
13.Return Connection
614. Air Sampling Point
15.Flue Sampling Point
7
16.Flow Connection
17.Condensate Outlet
18.PCBControl Box (shown removed for clarity)
19.Boiler Control (cover open)
8
The Boiler Control operates the boiler remotely. This is supplied with the firefront and is fitted, in operation, to the firefront spacer frame.
IMPORTANT: To commission the boiler it is is necessary to remove the Boiler Control from the firefront packaging and connect it to the boiler at the upper right hand side (item 6).
9
Fig. 3
18
PCBControl Box
19
Calibration Controls
8© Baxi Heating UK Ltd 2009