Inlet Gas Pressure

Fig. 40a

Test Point

8.0Completion & Commissioning

8.2Commissioning the Boiler (cont.)

IMPORTANT:The combustion for this appliance has been checked, adjusted and preset at the factory for operation on the gas type specified on the appliance data plate. No measurement of the combustion is necessary. Do not adjust the air/gas ratio valve.

Having checked:

That the boiler has been installed in accordance with these instructions.

The integrity of the flue system and the flue seals, as described in Section 7.2.

Proceed to put the boiler into operation as follows:

Check the Operational Gas Inlet Pressure

14.Set the boiler to operate at maximum rate as described in Section 11.1.2 to 11.1.6.

15.With the boiler operating in the maximum rate condition check that the operational gas pressure at the inlet gas pressure test point is 20mb (Fig. 40a).

16.Ensure that this inlet pressure can be obtained with all other gas appliances in the property working.

Measure the Gas Rate

17.With any other appliances & pilot lights turned OFF the gas rate can be measured. It should be between 1.55 and 1.71m3/h.

18.Carefully read and complete all sections of the Benchmark Commissioning Checklist at the rear of this publication that are relevant to the boiler and installation. These details will be required in the event of any warranty work. The publication must be handed to the user for safe keeping and each subsequent regular service visit recorded.

For IE, it is necessary to complete a “Declaration of Conformity” to indicate compliance with I.S. 813. An example of this is given in I.S. 813 “Domestic Gas Installations”. This is in addition to the Benchmark Commissioning Checklist.

19.Disconnect the Boiler Control and fit the firefront in accordance with the instructions supplied with it.

IMPORTANT: The loose boiler serial number label supplied in the boiler kit must be applied to an area of the spacer frame that is visible to the end user e.g. lower right hand side.

26© Baxi Heating UK Ltd 2009

Image 26 Contents
Baxi Bermuda BBU 15 HE 0086 Installer Notification Guidelines Scheme Members onlyCodes of Practice, most recent version should be used Important Installation, Commissioning, Service & RepairLegislation Safe Manual Handling Contents Description ContentsIntroduction General Layout Layout FigFlue Kit 10m & 12.5m a Technical Data Bermuda HE Cbbu 15 HETreatment of Water Circulating Systems System DetailsWater Circulating Systems There is a drain cock supplied in the plumbing kitStorage Systems PipeworkSystem Controls Sealed Systems Figs , 7 Sealed Systems Location Site RequirementsBuilders Opening Fig Fireplace Opening & SurroundFlue No Horizontal Runs are PermittedElectrical Supply Fig VentilationGas Supply Fig Electrical Connection Gas ConnectionCondensate Drain General Condensate Disposal FigCondensate Pump Operation Total volume of the sump is 1.5 litresCondensate Disposal From Boiler 500mm MinBoiler Internal Wiring Boiler Internal Illustrated Wiring DiagramFlue System InstallationInitial Preparation Barb ‘C’ Clip Air Cowl Air Duct Collar Ribs Terminal Cap Gas Connection Siting the BoilerWater Connections Electrical ConnectionCommissioning the Boiler Completion & CommissioningCompletion Test Point Annual Servicing Annual ServicingAnnual Servicing Inspection Changing Components Electrode Assembly FigChanging Components Spark Generator FigSpark Generator Plug Electrode Fan Injector Fan FigBurner Fig Burner Spark Generator Plug Gas Feed Pipe InjectorInjector Gas Valve Earth Wire Gas Valve FigPCB Fig Safety Thermostat FigFloat Switches Fig NTC FigFlue Sampling Point Display Control Knobs Setting the Gas ValveSetting the Gas Valve CO2 check Error Codes Fault FindingInitial Fault Finding Checks Switch for 5 seconds Error 110 flashingBurner lights Press the Service Reset Go to section ‘A’Terminals 1 Voltage at PCB X2 connector is Clean condensate drain systemX2 connector, is 230V AC across Spark gap and position Check wiringReplace Safety Thermostat Replace flame sensing electrode13.0 Short Parts List Short Parts ListPage Page Page GAS Boiler System Commissioning Checklist Service Record Date Energy Efficiency Checklist completed?Installer Details name, address and contact numbers Warranty & ServiceSerial Number Date of Installation After Sales Service 0844 871