Baxi Potterton Gold HE A Range manual Site Requirement, Ventilation of Compartments, Gas Supply

Page 16

Gas Service Cock

Fig. 10

Zone 2

 

Window

 

Recess

 

Zone 1

 

Zone 2

 

 

Zone 3

Zone 0

 

0.6 m

2.4 m

 

Window

 

Recess

 

Zone 2

 

Zone 3

 

Fig. 11

In GB Only

 

 

 

Ceiling

 

 

Outside Zones

 

Zone 2

Zone 3

 

 

 

 

Window

 

 

 

Recess

 

 

 

Zone 2

Outside

 

 

 

3.0 m

 

 

Zones

 

Zone 3

2.25 m

Zone 1

Zone 2

 

 

 

Zone 0

 

 

 

0.6 m

2.4 m

Fig. 12

In GB Only

7.0Site Requirement

7.3Ventilation of Compartments

1.Where the appliance is installed in a cupboard or compartment, no air vents are required.

2.BS 5440: Part 2 refers to room sealed appliances installed in compartments. The appliance will run sufficiently cool without ventilation.

7.4Gas Supply

1.The gas installation should be in accordance with the relevant standards. In GB this is BS 6891. In IE this is the current edition of I.S. 813 “Domestic Gas Installations”.

2.The connection to the appliance is a 22mm copper tail located at the rear of the gas service cock (Fig. 10).

3.Ensure that the pipework from the meter to the appliance is of adequate size. Do not use pipes of a smaller diameter than the boiler gas connection (22mm).

7.5Electrical Supply

1.External wiring must be correctly earthed, polarised and in accordance with relevant regulations/rules. In GB this is the current I.E.E. Wiring Regulations. In IE reference should be made to the current edition of ETCI rules.

2.The mains supply is 230V ~ 50Hz fused at 3A.

NOTE: The method of connection to the electricity supply must facilitate complete electrical isolation of the appliance.

Connection may be via a fused double-pole isolator with a contact separation of at least 3mm in all poles and servicing the boiler and system controls only.

7.6Bath & Shower Rooms

1.As the boiler is fitted with an integral timer when installed in a room containing a bath or shower it cannot be fitted in zones 1 or 2. (Figs. 11 & 12 shows zone dimensions for a bathtub. For other examples refer to Section 601 of the Current I.E.E. Wiring Regulations). Reference must be made to the relevant requirements. In GB this is the current I.E.E. Wiring Regulations and Building Regulations.

In IE reference should be made to the current edition of I.S.

813“Domestic Gas Installations” and the current ETCI rules.

16© Baxi Heating UK Ltd 2008

Image 16
Contents Installation & Service Instructions Natural Gas BS-EN ISO 9001 Accredited CompanyInstaller Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairCodes of Practice refer to the most recent version Safe Manual Handling GeneralPreparation TechniqueContents Introduction Contents of PackDescription General Layout LayoutAppliance Operation Frost Protection ModePump Protection Technical Data Gold Combi 24, 28 & 33 HE aDimensions and Fixings OrientationFlue Ø 100mm Tap Rail 32.5 mm Condensate Drain 65 mm 22mm 15mmSystem Details InformationCentral Heating Circuit BypassExpansion Vessel Central Heating only System Filling and Pressurising FigPressure Relief Valve Fig Showers Domestic Hot Water Circuit FigHard Water Areas Location Site RequirementsClearances Figs Site Requirement Ventilation of CompartmentsGas Supply Electrical SupplyCondensate Drain Flue Flue terminal guardFlue Options Horizontal FluesHorizontal Flue Systems This bend is equivalent to 1 metreVertical Flues Twin Pipe Twin & Vertical Flue SystemsMetre for each 91.5 bend Metre for each 135 bend This bend is equivalent to 1 metreKey Accessory Size Code No Flue Accessories5111079 Air duct adaptor Flue Duct AdaptorFor Twin Flue Systems fit the adaptors as follows Flue Dimensions For Roof TerminalsFlue Trim Flue Deflector FigPlume Displacement Kit Fig Plume DisplacementMetres Ring Adaptor Additional Accessories Elbow 5121369 Elbow Pair 5121370 28/33Determining Permissible Lengths ExampleShown in . Complete the installation of the 60Ø General Fitting Notes30mm Exhaust, securing in the bracketsPlume Outlet Elbow Unpacking & Initial Preparation InstallationFlushing Loop and valves must be connected as shown in the diagram a Fitting the Filling LoopDouble Check Valve Stop Valve Temporary Filling Loop Hose Fitting Cold Inlet Stop ValveFitting The Boiler Fitting the Pressure Relief Discharge Pipe FigCondensate Drain see section Tighten all the connectionsFitting The Flue Wall Thickness WasteFlue Elbow Ensure Elbow is fully Engaged into BoilerEnsure Flue is fully Engaged into Flue Elbow Inner Flue Support BracketEnsure Extension is Fully engaged into Boiler Adaptor Making The Electrical Connections Preliminary Electrical ChecksTerminal Block Cover Cable ClampSelector Switch Display CommissioningCommissioning the Boiler Heat Exchanger Automatic Air Vent Screw PumpTemperature Control CheckingSetting the Timer Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingBurner Annual ServicingViewing Window Igniter Fig Changing ComponentsSpark and Sensing Electrodes Fig Fan Fig Venturi FigInjector Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorInsulation Fig Burner FigExtension Piece Central Heating Temperature Sensor NTC Fig Safety Thermostat FigDHW Temperature Sensor NTC Fig Flue/Heat Exchanger Thermostat Sensor FigHeat Exchanger Automatic Air Vent Fig Pump Head Only FigPump Complete Fig Automatic Air Vent FigPressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Figs Plate Heat Exchanger FigSelector Switch Fig 14.20 P.C.B. FigCompletely undo the screws securing the control box Pin FigExpansion Vessel Fig Gas Valve FigVenturi Inlet Pipe Combustion Check Temperature Control Selector Switch DisplayChecking the CO2 Illustrated Wiring Diagram ElectricalShort Parts List Short Parts ListKey Description Manufacturers Initial Fault Finding Checks Fault FindingError Codes Error 133 flashing Reset position for 5 secondsDisplay illuminates Pump runsError 110 flashing Domestic Hot Water Follow operational sequenceTurn Domestic Hot Water Open DHW tap fullyPCB X3 connector terminals 3 Switch terminalFan jammed or faulty winding Replace PCB Is there 230V at Main terminals L and N Main terminal fuseGas at burner Replace gas valveTerminals 1 Ensure that the Hall Effect Sensor is in positionReplace PCB Is there 230V at Replace safety thermostatReplace heat exchanger GAS Boiler Commissioning Checklist Service Interval Record Brooks House, Coventry Road, Warwick. CV34 4LL UK Comp No 5116282 Iss 7 4/08