Baxi Potterton Gold HE A Range manual Flue Duct Adaptor, Air duct adaptor

Page 22

Flue Duct Adaptor

Blanking Plate

Boiler Adaptor

Air Duct Adaptor

Gasket

Restrictor

Gasket

8.0 Flue Options

For Twin Flue Systems fit the adaptors as follows:-

8.4Flue Duct Adaptor

1.Engage the flue duct adaptor on the boiler adaptor, making sure that it is pushed down as far as possible.

8.5Air duct adaptor

1.Undo the screws securing the blanking plate to the boiler top panel. Discard the plate.

2.There are three restrictor plates supplied in the kit. One marked ‘23’ and one marked ‘27’, these can be discarded

The third restrictor MUST be positioned as shown in the diagrams below.

3.Take one of the gaskets supplied in the kit and place on the boiler top panel.

4.Align the appropriate restrictor as shown. Position the second gasket over the restrictor.

5.Using the screws previously removed secure the inlet adaptor to the top panel.

6.Continue to fit the twin flue system.

Position of Restrictor

24 kW models

28/33 kW models

22© Baxi Heating UK Ltd 2008

Image 22
Contents Installation & Service Instructions Natural Gas BS-EN ISO 9001 Accredited CompanyInstaller Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairCodes of Practice refer to the most recent version Preparation Safe Manual HandlingGeneral TechniqueContents Introduction Contents of PackDescription General Layout LayoutAppliance Operation Frost Protection ModePump Protection Technical Data Gold Combi 24, 28 & 33 HE aFlue Ø 100mm Tap Rail 32.5 mm Condensate Drain 65 mm Dimensions and FixingsOrientation 22mm 15mmCentral Heating Circuit System DetailsInformation BypassExpansion Vessel Central Heating only System Filling and Pressurising FigPressure Relief Valve Fig Showers Domestic Hot Water Circuit FigHard Water Areas Location Site RequirementsClearances Figs Gas Supply Site RequirementVentilation of Compartments Electrical SupplyCondensate Drain Flue Flue terminal guardHorizontal Flue Systems Flue OptionsHorizontal Flues This bend is equivalent to 1 metreMetre for each 91.5 bend Vertical Flues Twin PipeTwin & Vertical Flue Systems Metre for each 135 bend This bend is equivalent to 1 metreKey Accessory Size Code No Flue Accessories5111079 Air duct adaptor Flue Duct AdaptorFor Twin Flue Systems fit the adaptors as follows Flue Trim Flue DimensionsFor Roof Terminals Flue Deflector FigPlume Displacement Kit Fig Plume DisplacementMetres Ring Adaptor Determining Permissible Lengths Additional Accessories Elbow 5121369 Elbow Pair 512137028/33 Example30mm Shown in . Complete the installation of the 60ØGeneral Fitting Notes Exhaust, securing in the bracketsPlume Outlet Elbow Unpacking & Initial Preparation InstallationFlushing Double Check Valve Stop Valve Temporary Filling Loop Loop and valves must be connected as shown in the diagram aFitting the Filling Loop Hose Fitting Cold Inlet Stop ValveCondensate Drain see section Fitting The BoilerFitting the Pressure Relief Discharge Pipe Fig Tighten all the connectionsFlue Elbow Fitting The FlueWall Thickness Waste Ensure Elbow is fully Engaged into BoilerEnsure Flue is fully Engaged into Flue Elbow Inner Flue Support BracketEnsure Extension is Fully engaged into Boiler Adaptor Terminal Block Cover Making The Electrical ConnectionsPreliminary Electrical Checks Cable ClampCommissioning the Boiler Selector Switch DisplayCommissioning Heat Exchanger Automatic Air Vent Screw PumpTemperature Control CheckingSetting the Timer Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingBurner Annual ServicingViewing Window Igniter Fig Changing ComponentsSpark and Sensing Electrodes Fig Injector Fig Fan FigVenturi Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorInsulation Fig Burner FigExtension Piece DHW Temperature Sensor NTC Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig Flue/Heat Exchanger Thermostat Sensor FigPump Complete Fig Heat Exchanger Automatic Air Vent FigPump Head Only Fig Automatic Air Vent FigPressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Figs Plate Heat Exchanger FigCompletely undo the screws securing the control box Selector Switch Fig14.20 P.C.B. Fig Pin FigExpansion Vessel Fig Gas Valve FigVenturi Inlet Pipe Combustion Check Temperature Control Selector Switch DisplayChecking the CO2 Illustrated Wiring Diagram ElectricalShort Parts List Short Parts ListKey Description Manufacturers Initial Fault Finding Checks Fault FindingError Codes Display illuminates Error 133 flashingReset position for 5 seconds Pump runsTurn Domestic Hot Water Error 110 flashingDomestic Hot Water Follow operational sequence Open DHW tap fullyFan jammed or faulty winding Replace PCB PCB X3 connector terminals 3Switch terminal Is there 230V at Main terminals L and N Main terminal fuseTerminals 1 Gas at burnerReplace gas valve Ensure that the Hall Effect Sensor is in positionReplace PCB Is there 230V at Replace safety thermostatReplace heat exchanger GAS Boiler Commissioning Checklist Service Interval Record Brooks House, Coventry Road, Warwick. CV34 4LL UK Comp No 5116282 Iss 7 4/08