Baxi Potterton Gold HE A Range manual Technical Data, Gold Combi 24, 28 & 33 HE a

Page 10

4.0Technical Data

4.1Gold Combi 24, 28 & 33 HE A

Appliance Type

 

 

 

C13

C33

C53

 

 

Appliance Category

CAT I 2H

 

 

 

Heat Input CH (Net)

Max

Min

 

 

24 model

 

kW

20.5

7

 

 

28 model

 

kW

24.7

9

 

 

33 model

 

kW

28.9

9.7

 

 

 

 

 

 

 

 

 

 

Heat Input CH (Gross)

Max

Min

 

 

24 model

kW

22.7

7.8

 

 

28 model

kW

27.4

10

 

 

33 model

kW

32.1

10.8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Output CH (Non-Condensing)

 

 

 

 

 

 

 

 

 

 

 

 

Max

Min

 

 

24 model

 

kW

20

6.8

 

 

28 model

 

kW

24

8.7

 

 

33 model

 

kW

28

9.4

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Output CH (Condensing)

 

 

 

 

 

 

 

 

 

 

 

 

Max

Min

 

 

24 model

 

kW

21

7.4

 

 

28 model

 

kW

25.9

9.5

 

 

33 model

 

kW

30.3

10.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Input DHW (Net)

Max

 

 

 

 

24 model

 

kW

24.7

 

 

 

 

28 model

 

kW

28.9

 

 

 

 

33 model

 

kW

34

 

 

 

 

 

 

 

 

 

 

Heat Input DHW (Gross)

Max

 

 

 

24 model

 

kW

27.4

 

 

 

28 model

 

kW

32.1

 

 

 

33 model

 

kW

37.7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Output DHW

Max

 

 

 

 

24 model

 

kW

24

 

 

 

 

28 model

 

kW

28

 

 

 

 

33 model

 

kW

33

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Max Gas Rate (Natural Gas - G20)

 

 

 

 

 

 

 

 

 

(After 10 mins)

 

 

 

 

 

24 model

 

m3/h

2.61

 

 

 

 

 

28 model

 

m3/h

3.1

 

 

 

 

 

33 model

 

m3/h

3.6

 

 

 

Inlet Pressure (Natural Gas - G20)

mbar

20

 

 

 

 

 

 

 

 

 

 

Injector (Natural Gas - G20)

 

 

 

7.5mm (24&28 model)

12mm(33 model)

 

 

 

 

 

 

Electrical Supply

 

230V~ 50Hz

(Appliance must be connected to an

earthed supply)

 

 

 

 

 

 

 

 

 

 

 

 

Power Consumption

 

 

 

 

155W (24 & 28 model)

160W (33 model)

 

 

 

 

 

 

 

 

Electrical Protection

 

 

 

 

 

 

 

 

IPX0D

 

 

 

 

 

 

 

External Fuse Rating

 

3A

 

 

 

 

 

 

 

 

Internal Fuse Rating

 

F2L

 

 

 

 

 

 

 

 

Condensate Drain

To accept 21.5mm (3/4 in) plastic waste pipe

Flue Terminal

Diameter

100mm

Dimensions

Projection

125mm

 

 

 

 

 

 

Connections

 

 

 

copper tails

Gas Supply

 

 

-

22mm

Central Heating Flow

 

 

-

22mm

Central Heating Return

-

22mm

Cold Water Mains Inlet

-

15mm

DHW Flow

 

 

-

15mm

Pressure Relief Discharge

-

15mm

 

 

 

 

 

 

 

 

 

Outercase Dimensions

 

 

 

 

Casing Height

 

 

 

- 780mm

Overall Height Inc Flue Elbow

- 965mm

Casing Width

 

 

 

- 450mm

Casing Depth

 

 

 

- 345mm

 

 

 

 

 

 

 

 

 

 

Clearances

 

 

 

 

 

 

Above Casing

200 mm Min

 

 

Below Casing

200 mm Min

 

 

Front

450 mm Min (For Servicing)

Front

5 mm Min (In Operation)

L.H. Side

5 mm Min

 

 

 

R.H. Side

5 mm Min (In Operation)

 

 

 

 

 

 

 

 

 

Weights (kg)

 

 

 

 

 

 

 

 

 

 

 

 

(24)

(28)

(33)

 

Packaged Boiler Carton

48.6

49.2

51

 

Installation Lift Weight

43.6

44.2

46

 

NOx Class

 

5

 

 

Central Heating Primary Circuit

 

Pressures

 

 

 

 

 

 

 

 

 

 

bar

Safety Discharge

 

 

 

3

Max Operating

 

 

 

2.5

Min Operating

 

 

 

0.5

Recommended Operating Range

1-2

 

 

 

 

 

 

 

DHW Circuit

 

bar

 

Pressures

 

 

 

 

Max Operating

 

8

 

 

Min Operating

 

0.15

 

 

 

 

 

 

 

 

Flow Rates

(24)

(28)

(33)

 

 

 

l/min

l/min

l/min

DHW Flow Rate

 

 

 

 

@ 30o CRise

11.43

13.3

15.7

DHW Flow Rate

 

 

 

 

@ 35o CRise

9.8

11.5

13.5

Min Working

 

 

 

 

DHW Flow Rate

2

2

 

2

 

 

 

 

 

 

Pump

 

 

 

 

Available Head

See graph below

 

 

 

 

Expansion Vessel

- (For Central Heating

only. Integral with appliance)

 

 

 

 

 

 

 

bar

 

Min Pre-charge Pressure

0.5

 

 

 

 

 

(24,28)

(33)

Max Capacity of

 

litre

litre

CH System

 

125

155

Primary Water Content

 

 

 

of Boiler (unpressurised)

2.5

2.8

Temperatures

C.H. Flow Temp (adjustable)

25°C to 80°C max (± 5°C)

D.H.W. Flow Temp (adjustable)

35°C to 60°C max (± 5°C) dependent upon flow rate

SEDBUK Declaration

The efficiency is 91.1% (all models)

This value is used in the UK Government’s Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from which it has been calculated has been certified by 0087.

Pump - Available Head

 

5.5

 

5

 

4.5

 

4

 

3.5

 

3

(wg)

2.5

 

Metre

2

1.5

 

 

1

0.5

0

0

200

400

600

800

1000

1200

10© Baxi Heating UK Ltd 2008

Flow Rate (l/h)

Image 10
Contents Installation & Service Instructions Natural Gas BS-EN ISO 9001 Accredited CompanyInstaller Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairCodes of Practice refer to the most recent version Preparation Safe Manual HandlingGeneral TechniqueContents Introduction Contents of PackDescription General Layout LayoutAppliance Operation Frost Protection ModePump Protection Technical Data Gold Combi 24, 28 & 33 HE aFlue Ø 100mm Tap Rail 32.5 mm Condensate Drain 65 mm Dimensions and FixingsOrientation 22mm 15mmCentral Heating Circuit System DetailsInformation BypassExpansion Vessel Central Heating only System Filling and Pressurising FigPressure Relief Valve Fig Showers Domestic Hot Water Circuit FigHard Water Areas Location Site RequirementsClearances Figs Gas Supply Site RequirementVentilation of Compartments Electrical SupplyCondensate Drain Flue Flue terminal guardHorizontal Flue Systems Flue OptionsHorizontal Flues This bend is equivalent to 1 metreMetre for each 91.5 bend Vertical Flues Twin PipeTwin & Vertical Flue Systems Metre for each 135 bend This bend is equivalent to 1 metreKey Accessory Size Code No Flue Accessories5111079 Air duct adaptor Flue Duct AdaptorFor Twin Flue Systems fit the adaptors as follows Flue Trim Flue DimensionsFor Roof Terminals Flue Deflector FigPlume Displacement Kit Fig Plume DisplacementMetres Ring Adaptor Determining Permissible Lengths Additional Accessories Elbow 5121369 Elbow Pair 512137028/33 Example30mm Shown in . Complete the installation of the 60ØGeneral Fitting Notes Exhaust, securing in the bracketsPlume Outlet Elbow Unpacking & Initial Preparation InstallationFlushing Double Check Valve Stop Valve Temporary Filling Loop Loop and valves must be connected as shown in the diagram aFitting the Filling Loop Hose Fitting Cold Inlet Stop ValveCondensate Drain see section Fitting The BoilerFitting the Pressure Relief Discharge Pipe Fig Tighten all the connectionsFlue Elbow Fitting The FlueWall Thickness Waste Ensure Elbow is fully Engaged into BoilerEnsure Flue is fully Engaged into Flue Elbow Inner Flue Support BracketEnsure Extension is Fully engaged into Boiler Adaptor Terminal Block Cover Making The Electrical ConnectionsPreliminary Electrical Checks Cable ClampCommissioning the Boiler Selector Switch DisplayCommissioning Heat Exchanger Automatic Air Vent Screw PumpTemperature Control CheckingSetting the Timer Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingBurner Annual ServicingViewing Window Igniter Fig Changing ComponentsSpark and Sensing Electrodes Fig Injector Fig Fan FigVenturi Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorInsulation Fig Burner FigExtension Piece DHW Temperature Sensor NTC Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig Flue/Heat Exchanger Thermostat Sensor FigPump Complete Fig Heat Exchanger Automatic Air Vent FigPump Head Only Fig Automatic Air Vent FigPressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Figs Plate Heat Exchanger FigCompletely undo the screws securing the control box Selector Switch Fig14.20 P.C.B. Fig Pin FigExpansion Vessel Fig Gas Valve FigVenturi Inlet Pipe Combustion Check Temperature Control Selector Switch DisplayChecking the CO2 Illustrated Wiring Diagram ElectricalShort Parts List Short Parts ListKey Description Manufacturers Initial Fault Finding Checks Fault FindingError Codes Display illuminates Error 133 flashingReset position for 5 seconds Pump runsTurn Domestic Hot Water Error 110 flashingDomestic Hot Water Follow operational sequence Open DHW tap fullyFan jammed or faulty winding Replace PCB PCB X3 connector terminals 3Switch terminal Is there 230V at Main terminals L and N Main terminal fuseTerminals 1 Gas at burnerReplace gas valve Ensure that the Hall Effect Sensor is in positionReplace PCB Is there 230V at Replace safety thermostatReplace heat exchanger GAS Boiler Commissioning Checklist Service Interval Record Brooks House, Coventry Road, Warwick. CV34 4LL UK Comp No 5116282 Iss 7 4/08