Terminal Block Cover
Fig. 58
Fig. 59 | Facia Panel | |
Cable Clamp | ||
|
Fused Spur
LN
Room ‘Stat
N
|
| bk | 1 |
|
230V |
| bk | 2 |
|
|
| g/y |
|
|
| N | b |
|
|
|
|
|
| |
| L | br |
|
|
|
|
|
| |
Fig. 60 |
|
|
|
|
| Frost | Thermostat |
|
|
Fused Spur |
|
|
|
|
L N |
|
|
|
|
Room ‘Stat | 230V |
|
| |
N |
|
| ||
|
|
|
| |
|
|
| bk | 1 |
| 230V |
| bk | 2 |
|
|
| ||
External Clock |
|
| g/y |
|
|
| N | b |
|
|
|
|
| |
|
| L | br |
|
Fig. 61 |
|
|
| |
|
|
|
|
NOTE: The 230V switched signal for external controls (Frost Stat - Room Stat - Timer) must always be taken from terminal 2 at the boiler. Live, Neutral and Earth to power these controls must be taken from the Fused Spur.
10.0Installation
10.8Making The Electrical Connections
The boiler is fitted with a 1.3m length of 3 core cable. This can be connected to the fused 3A 230V 50HZ supply.
NOTE: Both the Live and Neutral connections are fused.
To connect an external control proceed as follows:-
1.Slacken the facia panel securing screws and lift the outercase panel so that its securing tabs are clear of the facia. Remove the panel.
2.Completely undo the screws securing the facia panel and hinge it down (Fig. 58).
3.Undo the terminal block cover securing screw and remove the cover (Fig. 58).
4.Slacken the unused cable clamp on the LH side of the boiler chassis (Fig. 59). Insert the external control wiring through the clamp and route it to the terminal block.
5.Refer to the instructions supplied with the control.
IMPORTANT: The room thermostat MUST be suitable for 230V switching.
NOTE: An external frost thermostat cannot be used with the optional integral timer.
6.Remove the link between terminals 1 & 2. The 230V supply at terminal 2 must be connected to the thermostat. The switched output from the thermostat must be connected to terminal 1 (Figs. 60 & 61). If the room thermostat being used incorporates an anticipator it MUST be wired as shown in Figs. 60 & 61.
7.Ensure that the external control input cable(s) have sufficient slack to allow the control box to drop down. Tighten the cable clamp on the boiler chassis.
8.Replace the terminal block cover, routing the external control input cable(s) through the second
10.9Preliminary Electrical Checks
1.Prior to commissioning the boiler preliminary electrical system checks should be carried out.
2.These should be performed using a suitable meter, and include checks for Earth Continuity,
Resistance to Earth, Short Circuit and Polarity.