CONTENTS
| Section |
| Page | |
| 1.0 | Introduction | 7 | |
|
|
|
|
|
| 2.0 | General Layout | 8 | |
|
|
|
|
|
| 3.0 | Appliance Operation | 9 | |
|
|
|
|
|
| 4.0 | Technical Data | 10 | |
|
|
|
|
|
| 5.0 | Dimensions and Fixings | 11 | |
|
|
|
|
|
| 6.0 | System Details | 12 | |
|
|
|
|
|
| 7.0 | Site Requirements | 15 | |
|
|
|
|
|
| 8.0 | Flue Options | 19 | |
|
|
|
|
|
| 9.0 | Plume Displacement | 24 | |
|
|
|
|
|
| 10.0 | Installation | 28 | |
|
|
|
|
|
| 11.0 | Commissioning | 34 | |
|
|
|
|
|
| 12.0 | Completion | 37 | |
|
|
|
| |
| 13.0 | Servicing | 38 | |
|
|
|
| |
| 14.0 | Changing Components | 40 | |
|
|
|
| |
| 15.0 | Combustion Check | 49 | |
|
|
|
| |
| 16.0 | Electrical | 50 | |
|
|
|
| |
| 17.0 | Short Parts List | 51 | |
|
|
|
| |
| 18.0 | Fault Finding | 52 | |
|
|
|
|
|
|
|
| Benchmark Checklist | 58 |
|
|
|
|
|
6© Baxi Heating UK Ltd 2008