Baxi Potterton Gold HE A Range manual Contents

Page 6

CONTENTS

 

Section

 

Page

 

1.0

Introduction

7

 

 

 

 

 

 

2.0

General Layout

8

 

 

 

 

 

 

3.0

Appliance Operation

9

 

 

 

 

 

 

4.0

Technical Data

10

 

 

 

 

 

 

5.0

Dimensions and Fixings

11

 

 

 

 

 

 

6.0

System Details

12

 

 

 

 

 

 

7.0

Site Requirements

15

 

 

 

 

 

 

8.0

Flue Options

19

 

 

 

 

 

 

9.0

Plume Displacement

24

 

 

 

 

 

 

10.0

Installation

28

 

 

 

 

 

 

11.0

Commissioning

34

 

 

 

 

 

 

12.0

Completion

37

 

 

 

 

 

13.0

Servicing

38

 

 

 

 

 

14.0

Changing Components

40

 

 

 

 

 

15.0

Combustion Check

49

 

 

 

 

 

16.0

Electrical

50

 

 

 

 

 

17.0

Short Parts List

51

 

 

 

 

 

18.0

Fault Finding

52

 

 

 

 

 

 

 

 

Benchmark Checklist

58

 

 

 

 

 

6© Baxi Heating UK Ltd 2008

Image 6
Contents Installation & Service Instructions Natural Gas BS-EN ISO 9001 Accredited CompanyInstaller Notification Guidelines Scheme Members onlyImportant Installation, Commissioning, Service & Repair LegislationCodes of Practice refer to the most recent version Preparation Safe Manual HandlingGeneral TechniqueContents Contents of Pack IntroductionDescription General Layout LayoutFrost Protection Mode Appliance OperationPump Protection Technical Data Gold Combi 24, 28 & 33 HE aFlue Ø 100mm Tap Rail 32.5 mm Condensate Drain 65 mm Dimensions and FixingsOrientation 22mm 15mmCentral Heating Circuit System DetailsInformation BypassSystem Filling and Pressurising Fig Expansion Vessel Central Heating onlyPressure Relief Valve Fig Domestic Hot Water Circuit Fig ShowersHard Water Areas Site Requirements LocationClearances Figs Gas Supply Site RequirementVentilation of Compartments Electrical SupplyCondensate Drain Flue Flue terminal guardHorizontal Flue Systems Flue OptionsHorizontal Flues This bend is equivalent to 1 metreMetre for each 91.5 bend Vertical Flues Twin PipeTwin & Vertical Flue Systems Metre for each 135 bend This bend is equivalent to 1 metreFlue Accessories Key Accessory Size Code No5111079 Flue Duct Adaptor Air duct adaptorFor Twin Flue Systems fit the adaptors as follows Flue Trim Flue DimensionsFor Roof Terminals Flue Deflector FigPlume Displacement Plume Displacement Kit FigMetres Ring Adaptor Determining Permissible Lengths Additional Accessories Elbow 5121369 Elbow Pair 512137028/33 Example30mm Shown in . Complete the installation of the 60ØGeneral Fitting Notes Exhaust, securing in the bracketsPlume Outlet Elbow Installation Unpacking & Initial PreparationFlushing Double Check Valve Stop Valve Temporary Filling Loop Loop and valves must be connected as shown in the diagram aFitting the Filling Loop Hose Fitting Cold Inlet Stop ValveCondensate Drain see section Fitting The BoilerFitting the Pressure Relief Discharge Pipe Fig Tighten all the connectionsFlue Elbow Fitting The FlueWall Thickness Waste Ensure Elbow is fully Engaged into BoilerInner Flue Support Bracket Ensure Flue is fully Engaged into Flue ElbowEnsure Extension is Fully engaged into Boiler Adaptor Terminal Block Cover Making The Electrical ConnectionsPreliminary Electrical Checks Cable ClampCommissioning the Boiler Selector Switch DisplayCommissioning Heat Exchanger Automatic Air Vent Screw PumpTemperature Control CheckingSetting the Timer Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingAnnual Servicing BurnerViewing Window Changing Components Igniter FigSpark and Sensing Electrodes Fig Injector Fig Fan FigVenturi Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorBurner Fig Insulation FigExtension Piece DHW Temperature Sensor NTC Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig Flue/Heat Exchanger Thermostat Sensor FigPump Complete Fig Heat Exchanger Automatic Air Vent FigPump Head Only Fig Automatic Air Vent FigPressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Figs Plate Heat Exchanger FigCompletely undo the screws securing the control box Selector Switch Fig14.20 P.C.B. Fig Pin FigGas Valve Fig Expansion Vessel FigVenturi Inlet Pipe Temperature Control Selector Switch Display Combustion CheckChecking the CO2 Illustrated Wiring Diagram ElectricalShort Parts List Short Parts ListKey Description Manufacturers Fault Finding Initial Fault Finding ChecksError Codes Display illuminates Error 133 flashingReset position for 5 seconds Pump runsTurn Domestic Hot Water Error 110 flashingDomestic Hot Water Follow operational sequence Open DHW tap fullyFan jammed or faulty winding Replace PCB PCB X3 connector terminals 3Switch terminal Is there 230V at Main terminals L and N Main terminal fuseTerminals 1 Gas at burnerReplace gas valve Ensure that the Hall Effect Sensor is in positionReplace safety thermostat Replace PCB Is there 230V atReplace heat exchanger GAS Boiler Commissioning Checklist Service Interval Record Brooks House, Coventry Road, Warwick. CV34 4LL UK Comp No 5116282 Iss 7 4/08