Natural Gas

Potterton Gold Combi 24 HE A

G.C.No 47 393 18

Potterton Gold Combi 28 HE A

G.C.No 47 393 19

Potterton Gold Combi 33 HE A

G.C.No 47 393 20

©Baxi Heating UK Ltd 2008 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, or stored in any retrieval system of any nature (including in any database), in each case whether electronic, mechanical, recording or otherwise, without the prior written permission of the copyright owner, except for permitted fair dealing under Copyrights, Designs and Patents Act 1988.

Applications for the copyright owner’s permission to reproduce or make other use of any part of this publication should be made, giving details of the proposed use, to the following address:

The Company Secretary, Baxi Heating UK Ltd, The Wyvern Business Park, Stanier Way, Derby, DE21 6BF.

Full acknowledgement of author and source must be given.

WARNING: Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages.

Building Regulations and the Benchmark Commissioning Checklist

Building Regulations (England & Wales) require notification of the installation of a heating appliance to the relevant Local Authority Building Control Department. From 1 April 2005 this can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the Local Authority directly. Similar arrangements will follow for Scotland and will apply in Northern Ireland from 1 January 2006.

CORGI operate a Self Certification Scheme for gas heating appliances.

These arrangements represent a change from the situation whereby compliance with Building Regulations was accepted as being demonstrated by completion of the Benchmark Logbook (which was then left on site with the customer).

With the introduction of Self Certification Schemes, the Benchmark Logbook is being withdrawn. However, a similar document in the form of a commissioning checklist and service interval record is incorporated at the back of these instructions.

This company is a member of the Benchmark initiative and fully supports the aims of the programme. Its aim is to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency.

Building Regulations require that installations should comply with manufacturer's instructions. It is therefore important that the commissioning checklist is completed by the installer. The relevant section of Building Regulations only relates to dwellings. Therefore the checklist only applies if the appliance is being installed in a dwelling or some related structure.

The flowchart opposite gives guidance for installers on the process necessary to ensure compliance with Building Regulations.

“Potterton” supports

Baxi Heating UK Ltd is a

BS-EN ISO 9001 Accredited Company

This product has an energy rating (A) on a scale of A to G.

For more information see www.boilers.org.uk. This is a certification mark.

2© Baxi Heating UK Ltd 2008

The code of practice for the installation, commissioning & servicing of central heating systems.

Image 2
Contents Installation & Service Instructions Natural Gas BS-EN ISO 9001 Accredited CompanyInstaller Notification Guidelines Scheme Members onlyCodes of Practice refer to the most recent version Important Installation, Commissioning, Service & RepairLegislation Preparation Safe Manual HandlingGeneral TechniqueContents Description Contents of PackIntroduction General Layout LayoutPump Protection Frost Protection ModeAppliance Operation Technical Data Gold Combi 24, 28 & 33 HE aFlue Ø 100mm Tap Rail 32.5 mm Condensate Drain 65 mm Dimensions and FixingsOrientation 22mm 15mmCentral Heating Circuit System DetailsInformation BypassPressure Relief Valve Fig System Filling and Pressurising FigExpansion Vessel Central Heating only Hard Water Areas Domestic Hot Water Circuit FigShowers Clearances Figs Site RequirementsLocation Gas Supply Site RequirementVentilation of Compartments Electrical SupplyCondensate Drain Flue Flue terminal guardHorizontal Flue Systems Flue OptionsHorizontal Flues This bend is equivalent to 1 metreMetre for each 91.5 bend Vertical Flues Twin PipeTwin & Vertical Flue Systems Metre for each 135 bend This bend is equivalent to 1 metre5111079 Flue AccessoriesKey Accessory Size Code No For Twin Flue Systems fit the adaptors as follows Flue Duct AdaptorAir duct adaptor Flue Trim Flue DimensionsFor Roof Terminals Flue Deflector FigMetres Ring Adaptor Plume DisplacementPlume Displacement Kit Fig Determining Permissible Lengths Additional Accessories Elbow 5121369 Elbow Pair 512137028/33 Example30mm Shown in . Complete the installation of the 60ØGeneral Fitting Notes Exhaust, securing in the bracketsPlume Outlet Elbow Flushing InstallationUnpacking & Initial Preparation Double Check Valve Stop Valve Temporary Filling Loop Loop and valves must be connected as shown in the diagram aFitting the Filling Loop Hose Fitting Cold Inlet Stop ValveCondensate Drain see section Fitting The BoilerFitting the Pressure Relief Discharge Pipe Fig Tighten all the connectionsFlue Elbow Fitting The FlueWall Thickness Waste Ensure Elbow is fully Engaged into BoilerEnsure Extension is Fully engaged into Boiler Adaptor Inner Flue Support BracketEnsure Flue is fully Engaged into Flue Elbow Terminal Block Cover Making The Electrical ConnectionsPreliminary Electrical Checks Cable ClampCommissioning the Boiler Selector Switch DisplayCommissioning Heat Exchanger Automatic Air Vent Screw PumpTemperature Control CheckingSetting the Timer Case Front Panel Facia Panel CompletionCompletion Servicing 13 .1 Annual ServicingViewing Window Annual ServicingBurner Spark and Sensing Electrodes Fig Changing ComponentsIgniter Fig Injector Fig Fan FigVenturi Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorExtension Piece Burner FigInsulation Fig DHW Temperature Sensor NTC Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig Flue/Heat Exchanger Thermostat Sensor FigPump Complete Fig Heat Exchanger Automatic Air Vent FigPump Head Only Fig Automatic Air Vent FigPressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Figs Plate Heat Exchanger FigCompletely undo the screws securing the control box Selector Switch Fig14.20 P.C.B. Fig Pin FigVenturi Inlet Pipe Gas Valve FigExpansion Vessel Fig Checking the CO2 Temperature Control Selector Switch DisplayCombustion Check Illustrated Wiring Diagram ElectricalKey Description Manufacturers Short Parts ListShort Parts List Error Codes Fault FindingInitial Fault Finding Checks Display illuminates Error 133 flashingReset position for 5 seconds Pump runsTurn Domestic Hot Water Error 110 flashingDomestic Hot Water Follow operational sequence Open DHW tap fullyFan jammed or faulty winding Replace PCB PCB X3 connector terminals 3Switch terminal Is there 230V at Main terminals L and N Main terminal fuseTerminals 1 Gas at burnerReplace gas valve Ensure that the Hall Effect Sensor is in positionReplace heat exchanger Replace safety thermostatReplace PCB Is there 230V at GAS Boiler Commissioning Checklist Service Interval Record Brooks House, Coventry Road, Warwick. CV34 4LL UK Comp No 5116282 Iss 7 4/08