State Industries STC-074 specifications Nine Rules for Good Vents

Page 14

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

When vents are combined, the area of the com- bined vent should be equal to area of the largewst single vent, plus 50% of area of all others joining.

EXAMPLE: To combine two 6” vents with an 8” vent, the area of a combined vent should be

one half area of two 6 inch

vents (14 + 14) plus area of 8 inch vent (50) or 78 sq. inches. Referring to char, 78

sq. inches require 10” diam eter vent.

 

Vent Size

Area in

 

Area in

 

Square Inches

Vent Size

Square Inches

 

5"

20

10"

79

 

6"

28

12"

113

 

7"

38

14"

154

 

8"

50

16"

201

 

9"

64

18"

254

NINE RULES FOR

GOOD VENTS

1.The vent pipe should ALWAYS be the same size as the outlet of the draft diverter or factory supplied vent reducer.

Model SBN 120 are supplied with a 6” to 5” reducer.

Models SBD 250, 251 and 275 are supplied with a 8” to 6” reducer.

2. The diameter of a vent pipe should NEVER be reduced, no matter what the circumstances.

Technical Training Department

13

©2003

Ashland City, Tennessee

Image 14
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Qualifications Custom Commercial Storage Tank Model Number Break DownInstallation Considerations Top and Front Views of Minimum Clearances To CombustiblesExterior Clearance Required Exterior ClearancesComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Vertical Ducts Make-Up Air Horizontal DuctsContaminated Air Air for Combustion Flammable ItemsGas Valve Outlet View Venting Venting Atmospheric Multiple HeatersNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Type B GAS Vent Multiple Gas Fired Tank-Type HeatersTechnical Dataventing Sequence Top ViewFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board Lower Front View of SBN Water Heater HSIWiring Diagram ECOElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Conditions Water Heater Control Ignition Control BoardFlash Codes of Diagnostic Indicator Test 2 Polarity CheckTest 2 Polarity Check Test 3 Continuity Check High Limit ECOIs indicated Test 4 Upper Temperature Probe Continuity CheckTest 3 Continuity Check of High Limit ECO Is not presentCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 Test 5 Calling for Heat no Inducer OperationWater Heater Control Test 6 Inducer ON-NO Ignition VAC Check of Blower Prover/Low Gas Pressure CircuitVoltage is not present between E4, Pin Test 8 Igniter Heats no Main Burner Test of Igniter and gas valve circuitTest 9 Igniter Heats no Main Burner Continuity Check Of Gas Valve CoilTest 10 Main Burner Ignition for Less than 5 Seconds Flame Prover Circuit CheckTest 11 Water Heater Shutting OFF below Setting If… ThenDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table