State Industries STC-074 specifications Installation Considerations

Page 5

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

INSTALLATION CONSIDERATIONS

This portion of the handbook reviews some often overlooked installation considerations —clearances, air supply, gas pressure requirements, and venting—taking note

of necessary installation requirements for SBN . The installation manual covers most of these items in detail.

Clearances

A 24-inch clearance for all serviceable parts is recommended. Clearances may vary between models. See instruction manual or the label on the heater for clearances applicable to your specific model.

Top and Front Views of Minimum Clearances To Combustibles

Minimum Clearances To Combustibles

Model

"A" Right

"B" Left Side

"C" Back

"D"

 

Side

 

 

Ceiling

SBN 71-120NE, SBN- 81-154NE, SBN 81-180NE, SBN 100-199NE

2"

2"

2"

12"

SBN 100-250NE(A), SBN 100-275NE(A), SBN 85-310NE(A)

3"

3"

3"

12"

SBN 85-366NE(A)

6"

6"

6"

6"

SBN 85-390NE(A)

4"

4"

4"

4"

A, B, and C clearances to non-combustibles is “0” inches - a 12 inch clearance to cover remains unchanged.

©2003

4

Technical Training Department

Ashland City, Tennessee

Image 5
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Custom Commercial Storage Tank Model Number Break Down QualificationsTop and Front Views of Minimum Clearances To Combustibles Installation ConsiderationsRequired Exterior Clearances Exterior ClearanceComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Horizontal Ducts Make-Up Air Vertical DuctsAir for Combustion Flammable Items Contaminated AirGas Valve Outlet View Venting Atmospheric Multiple Heaters VentingNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Multiple Gas Fired Tank-Type Heaters Type B GAS VentTechnical Dataventing Top View SequenceFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board HSI Lower Front View of SBN Water HeaterECO Wiring DiagramElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Water Heater Control Ignition Control Board ConditionsTest 2 Polarity Check Flash Codes of Diagnostic IndicatorTest 3 Continuity Check High Limit ECO Test 2 Polarity CheckTest 3 Continuity Check of High Limit ECO Test 4 Upper Temperature Probe Continuity CheckIs indicated Is not presentCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 Test 5 Calling for Heat no Inducer OperationWater Heater Control VAC Check of Blower Prover/Low Gas Pressure Circuit Test 6 Inducer ON-NO IgnitionVoltage is not present between E4, Pin Test of Igniter and gas valve circuit Test 8 Igniter Heats no Main BurnerContinuity Check Of Gas Valve Coil Test 9 Igniter Heats no Main BurnerFlame Prover Circuit Check Test 10 Main Burner Ignition for Less than 5 SecondsIf… Then Test 11 Water Heater Shutting OFF below SettingDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table