State Industries STC-074 specifications Contaminated Air, Air for Combustion Flammable Items

Page 10

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

Along with adequate make-up air, the quality of the air is important.

Contaminated Air

Rust

Chips

Contaminants in combustion air can lead to premature heater failure. Vapors from bleaches, soaps, waxes, salts, etc. are drawn into the combustion chamber with the make-up air and, once fired, mix with water vapor in the gases to form extremely corrosive hydrochloric or hydrofluoric acid and other corrosive by-products.

Air for Combustion – Flammable Items

Flammable items, pressurized containers or any other potentially hazardous articles must never be placed on or adjacent to the heater. Open containers of flammable material should not be stored or used in the same room with the heater.

Technical Training Department

9

©2003

Ashland City, Tennessee

Image 10
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Qualifications Custom Commercial Storage Tank Model Number Break DownInstallation Considerations Top and Front Views of Minimum Clearances To CombustiblesExterior Clearance Required Exterior ClearancesComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Vertical Ducts Make-Up Air Horizontal DuctsContaminated Air Air for Combustion Flammable ItemsGas Valve Outlet View Venting Venting Atmospheric Multiple HeatersNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Type B GAS Vent Multiple Gas Fired Tank-Type HeatersTechnical Dataventing Sequence Top ViewFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board Lower Front View of SBN Water Heater HSIWiring Diagram ECOElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Conditions Water Heater Control Ignition Control BoardFlash Codes of Diagnostic Indicator Test 2 Polarity CheckTest 2 Polarity Check Test 3 Continuity Check High Limit ECOIs indicated Test 4 Upper Temperature Probe Continuity CheckTest 3 Continuity Check of High Limit ECO Is not presentWater Heater Control Test 5 Calling for Heat no Inducer OperationCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 Test 6 Inducer ON-NO Ignition VAC Check of Blower Prover/Low Gas Pressure CircuitVoltage is not present between E4, Pin Test 8 Igniter Heats no Main Burner Test of Igniter and gas valve circuitTest 9 Igniter Heats no Main Burner Continuity Check Of Gas Valve CoilTest 10 Main Burner Ignition for Less than 5 Seconds Flame Prover Circuit CheckTest 11 Water Heater Shutting OFF below Setting If… ThenDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table