State Industries STC-074 specifications Required Exterior Clearances

Page 6

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

Exterior Clearance

The illustration below shows the required clearances for venting units using natural draft venting.

Required Exterior Clearances

“Copyright by the American Gas Association. Used by permission of the copyright holder”.

The vent must extend at least 3 feet above the highest point where it passes through a roof of a building and at least 2 feet higher than any portion of a building within a horizontal distance of 10 feet (for vents of 12 inches in diameter or less).

References: NFPA 54 ANSI Z 223.1 SEC 7.5.2a and Sec 7.6.2a may allow reduction to 8 feet with a “listed vent cap.”

Technical Training Department

5

©2003

Ashland City, Tennessee

Image 6
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Qualifications Custom Commercial Storage Tank Model Number Break DownInstallation Considerations Top and Front Views of Minimum Clearances To CombustiblesExterior Clearance Required Exterior ClearancesComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Vertical Ducts Make-Up Air Horizontal DuctsContaminated Air Air for Combustion Flammable ItemsGas Valve Outlet View Venting Venting Atmospheric Multiple HeatersNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Type B GAS Vent Multiple Gas Fired Tank-Type HeatersTechnical Dataventing Sequence Top ViewFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board Lower Front View of SBN Water Heater HSIWiring Diagram ECOElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Conditions Water Heater Control Ignition Control BoardFlash Codes of Diagnostic Indicator Test 2 Polarity CheckTest 2 Polarity Check Test 3 Continuity Check High Limit ECOIs indicated Test 4 Upper Temperature Probe Continuity CheckTest 3 Continuity Check of High Limit ECO Is not presentTest 5 Calling for Heat no Inducer Operation Water Heater ControlCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 Test 6 Inducer ON-NO Ignition VAC Check of Blower Prover/Low Gas Pressure CircuitVoltage is not present between E4, Pin Test 8 Igniter Heats no Main Burner Test of Igniter and gas valve circuitTest 9 Igniter Heats no Main Burner Continuity Check Of Gas Valve CoilTest 10 Main Burner Ignition for Less than 5 Seconds Flame Prover Circuit CheckTest 11 Water Heater Shutting OFF below Setting If… ThenDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table