State Industries STC-074 specifications Eco

Page 39

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

LED INDICATORS ON HOT SURFACE IGNITION (HSI)

USING FLASHING RED LED ON HSI (HOT SURFACE IGNITION)

 

LED STATUS

INDICATION

ACTION TO BE TAKEN

 

 

1 Flash

System is in lockout.

Interrupt power to

 

 

 

 

reset. Heater had not

 

 

 

 

sensed the flame

 

 

 

 

check gas supply and

 

 

 

 

igniter condition.

 

 

2 Flashes

Draft proving

Test for defective

 

 

 

(pressure) switch

switch or a

 

 

 

(closes at -2.10 +0.01

pressurized room

 

 

 

inches W.C. negative

condition that may be

 

 

 

pressure) failed to

forcing air through the

 

 

 

open within 5 seconds

inducer.

 

 

 

at the end of the last

 

 

 

 

cycle.

 

 

 

3 Flashes

Draft proving

Check the draft.

 

 

 

(pressure) switch

The low gas pressure

 

 

 

failed to close

switch closes at 5.2 inches W.C.

 

 

 

within 5 seconds after

may have remained open.

 

 

 

the inducer was

Verify the supply gas pressure

 

 

 

started.

while the gas is flowing.

 

 

 

 

 

 

 

4 Flashes

Open on high

Check temperature

 

 

control operation.

 

 

 

temperature

 

 

 

 

limit switch

 

 

 

 

(ECO)

 

 

 

6 Flashes

115-volt supply power

Verify that a neutral-to-ground

 

 

check results

 

 

 

connection is

in “0” volts and a hot-to-

 

 

 

indicating reversed

ground check

 

 

 

polarity.

results in 115-125 VAC.

 

 

 

 

 

 

 

 

 

 

 

©2003

38

Technical Training Department

Ashland City, Tennessee

Image 39
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Custom Commercial Storage Tank Model Number Break Down QualificationsTop and Front Views of Minimum Clearances To Combustibles Installation ConsiderationsRequired Exterior Clearances Exterior ClearanceComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Horizontal Ducts Make-Up Air Vertical DuctsAir for Combustion Flammable Items Contaminated AirGas Valve Outlet View Venting Atmospheric Multiple Heaters VentingNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Multiple Gas Fired Tank-Type Heaters Type B GAS VentTechnical Dataventing Top View SequenceFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board HSI Lower Front View of SBN Water HeaterECO Wiring DiagramElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Water Heater Control Ignition Control Board ConditionsTest 2 Polarity Check Flash Codes of Diagnostic IndicatorTest 3 Continuity Check High Limit ECO Test 2 Polarity CheckIs not present Test 4 Upper Temperature Probe Continuity CheckTest 3 Continuity Check of High Limit ECO Is indicatedTest 5 Calling for Heat no Inducer Operation Water Heater ControlCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 VAC Check of Blower Prover/Low Gas Pressure Circuit Test 6 Inducer ON-NO IgnitionVoltage is not present between E4, Pin Test of Igniter and gas valve circuit Test 8 Igniter Heats no Main BurnerContinuity Check Of Gas Valve Coil Test 9 Igniter Heats no Main BurnerFlame Prover Circuit Check Test 10 Main Burner Ignition for Less than 5 SecondsIf… Then Test 11 Water Heater Shutting OFF below SettingDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table