State Industries STC-074 specifications Electrical Sequence of SBN Water Heater Operation

Page 25

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

ELECTRICAL SEQUENCE OF SBN WATER HEATER OPERATION

120VAC

Power to Heater Green LED - On

Call for Heat

Green LED - On

Module Self Check

 

 

Low Gas Pressure

 

Natural Gas Models Only

 

 

Switch is Closed

 

 

 

 

 

 

 

 

Draft Proving Switch

 

 

 

 

Is Open

 

 

 

 

 

 

 

High Limit is Closed

 

 

 

 

 

Inducer On

 

 

 

 

 

 

Blower Prover

 

 

 

 

Closes -1.6 to -2.60 ± .10 W.C. depending on heater model

 

 

 

Ignition Control Board –

 

 

 

 

120 VAC

 

 

 

 

 

Variable Voltage

HSI Warm Up

 

 

 

 

20 seconds

 

 

 

 

(80-120 VAC)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Valve Open

 

3 Second Trial

 

 

 

 

 

 

 

HSI - Off

 

 

 

 

 

3 Seconds to Prove

 

 

 

 

 

Flame After HSI - Off

 

 

 

 

Flame Proves

 

 

Minimum Millivolt for

 

 

 

 

 

4.25 seconds

 

 

 

 

 

 

 

 

 

Yes

 

 

No

Yes

No

Tank Heated to Set Temperature

20 Second Blower Purge

Flash 7 Times

 

 

 

 

 

 

 

 

 

2 More Trials

 

1 Hour Auto Reset

 

 

 

 

 

 

 

 

Gas Valve – Off

 

 

To Prove Flame

 

 

Call for Heat LED - Off

 

 

 

 

 

60 Second Blower Post Purge

Yes

 

No

 

 

 

 

 

 

Blower Prover - Opens

 

 

Flash 8 Times On Diagnostic LED

 

 

 

 

 

Standby LED - On

 

 

Lock Out for 1 Hour

 

 

Then Retry

 

©2003

24

Technical Training Department

Ashland City, Tennessee

Image 25
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Custom Commercial Storage Tank Model Number Break Down QualificationsTop and Front Views of Minimum Clearances To Combustibles Installation ConsiderationsRequired Exterior Clearances Exterior ClearanceComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Horizontal Ducts Make-Up Air Vertical DuctsAir for Combustion Flammable Items Contaminated AirGas Valve Outlet View Venting Atmospheric Multiple Heaters VentingNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Multiple Gas Fired Tank-Type Heaters Type B GAS VentTechnical Dataventing Top View SequenceFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board HSI Lower Front View of SBN Water HeaterECO Wiring DiagramElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Water Heater Control Ignition Control Board ConditionsTest 2 Polarity Check Flash Codes of Diagnostic IndicatorTest 3 Continuity Check High Limit ECO Test 2 Polarity CheckTest 3 Continuity Check of High Limit ECO Test 4 Upper Temperature Probe Continuity CheckIs indicated Is not presentWater Heater Control Test 5 Calling for Heat no Inducer OperationCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 VAC Check of Blower Prover/Low Gas Pressure Circuit Test 6 Inducer ON-NO IgnitionVoltage is not present between E4, Pin Test of Igniter and gas valve circuit Test 8 Igniter Heats no Main BurnerContinuity Check Of Gas Valve Coil Test 9 Igniter Heats no Main BurnerFlame Prover Circuit Check Test 10 Main Burner Ignition for Less than 5 SecondsIf… Then Test 11 Water Heater Shutting OFF below SettingDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table