State Industries STC-074 specifications Test 6 Inducer ON-NO Ignition

Page 32

SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

TEST 6 - INDUCER ON-NO IGNITION

Conditions:

ƒPower on

ƒPlugs in receptacles

ƒInducer operating

ƒNo power to Hot Surface Igniter (HSI)

ƒNote flash code of LED

Draft Proving Pressure

Switch

Optional Hot

Water Outlet

Low Gas

Pressure

Switch

Draft Exhaust

Exhaust

Outlet

Inducer

TEST 6

24 VAC Check of Blower Prover/Low Gas Pressure Circuit

If…

 

...then

 

igntion board receptacles E1, Pin 7 to ground shows

 

replace Ignition board

 

no voltage

 

 

 

E1, Pin 7 has 24 Volt to ground

 

check wire connection to and from inducer

 

voltage check of each blower switch terminal to

 

switch is open - check for proper draft (should

ground shows voltage to only 1 terminal

 

also see LED 3 flash code)

 

 

 

check for blocked exhaust

 

 

 

check that blower outlet exhaust damper is open

 

 

replace blower (draft) proving switch

 

24V is present from each switch terminal to ground.

 

check wiring from blower switch to low gas

 

 

 

pressure switch

 

 

 

 

voltage check to each terminal of low gas pressure

 

switch is open - test for a minimum of 5.2 ± "

switch and ground shows only voltage on 1

 

W.C. Natural Gas or 10.5" Propane, flowing

 

terminal

 

supply gas pressure (should also see 3 Flash

 

 

LED code)

 

 

 

replace low gas pressure switch

 

voltage is present to each pressure switch terminal

 

check wiring from low gas pressure switch to

and ground

 

ignition board recetacles E1, Pin 10

 

Technical Training Department

31

©2003

 

 

Ashland City, Tennessee

Image 32
Contents Service Handbook Table of Contents SBN Service Handbook Introduction Qualifications Custom Commercial Storage Tank Model Number Break DownInstallation Considerations Top and Front Views of Minimum Clearances To CombustiblesExterior Clearance Required Exterior ClearancesComb AIR Make-Up Air Direct Communication Not Direct Vent Make-Up Air Vertical Ducts Make-Up Air Horizontal DuctsContaminated Air Air for Combustion Flammable ItemsGas Valve Outlet View Venting Venting Atmospheric Multiple HeatersNine Rules for Good Vents SBN Tank Type Commercial GAS Water Heater Service Handbook SBN Tank Type Commercial GAS Water Heater Service Handbook Type B GAS Vent Multiple Gas Fired Tank-Type HeatersTechnical Dataventing Sequence Top ViewFront View of Water Heater SBN Tank Type Commercial GAS Water Heater Service Handbook HSI Integrated Ignition Control Board Lower Front View of SBN Water Heater HSIWiring Diagram ECOElectrical Sequence of SBN Water Heater Operation PRE-SERVICE Checklist Conditions Water Heater Control Ignition Control BoardFlash Codes of Diagnostic Indicator Test 2 Polarity CheckTest 2 Polarity Check Test 3 Continuity Check High Limit ECOTest 4 Upper Temperature Probe Continuity Check Test 3 Continuity Check of High Limit ECOIs indicated Is not presentCheck to Inducer Test on Ignition Board 4 Pin Receptacle E4 Test 5 Calling for Heat no Inducer OperationWater Heater Control Test 6 Inducer ON-NO Ignition VAC Check of Blower Prover/Low Gas Pressure CircuitVoltage is not present between E4, Pin Test 8 Igniter Heats no Main Burner Test of Igniter and gas valve circuitTest 9 Igniter Heats no Main Burner Continuity Check Of Gas Valve CoilTest 10 Main Burner Ignition for Less than 5 Seconds Flame Prover Circuit CheckTest 11 Water Heater Shutting OFF below Setting If… ThenDisplay Lights on Integrated Heater Control ECO SBN Tank Type Commercial GAS Water Heater Service Handbook Technical Training Department 120 154 180 199 200A 250A 275A 310A 366A 400A General Questions and Answers SBN Tank Type Commercial GAS Water Heater Service Handbook Draft Proving Pressure Switch Table