Burnham MMII manual Operating Instructions

Page 20

Figure 22: Operating Instructions

D.Follow Operating Instructions to place boiler in operation. See Figure 22.

E.Sequence of Operation. See Figure 21. If boiler fails to operate properly, see Troubleshooting Tree on pages 26-27.

F.Check pilot burner flame. See Figure 24. Flame should be steady, medium hard blue enveloping 3/8 to ½ inch of sensing probe.

G.Check main burner flame. See Figure 23. Flame should have clearly defined inner cone with no yellow tipping. Orange-yellow streaks should not be confused with true yellow tipping.

H.Check thermostat operation. Raise and lower temperature setting to start and stop boiler operation.

I.Check domestic hot water (tank) aquastat operation. Raise and lower temperature setting to start and stop boiler operation. Tank aquastat should be set at least

20

Image 20
Contents Minuteman 81404025R13-1/07 Price $3.00Table of Contents Dimensional Drawing Pre-Installation Minimum Clearances to Combustible SurfacesDo not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerIII. Water Piping and Trim Page Internal Water Piping System Diagram IV. Domestic Hot Water Performance and Piping Domestic Hot Water RatingsGas Piping Rated InputFitting Equivalent Lengths Specific Gravity Correction FactorsVI. Venting / Air Intake Piping ComponentGeneral Guidelines Vent/Air Intake LengthInstall Vent Connector Burnham Vent System ComponentsInstall Vent Pipe, Burnham Gasketed Vent System Install Vent Pipe, GeneralInstall Vent Pipe, Burnham Gasket-Less Vent System Horizontal Through Wall Vent Installation Burnham Gasketed Vent Joint DetailRecommended Horizontal Vent Installation Vertical Through Roof Vent Installation Horizontal Vent Pipe Wall PenetrationVertical Vent Installation Install Air Intake PipeWiring Diagram VII. ElectricalPrepare to check operation Do not install an automatic fill valve with this boilerVIII. System Start-up Operating Instructions Adjust gas input rate to boiler Check Boiler High LimitGas Flow Rate in Cubic Feet per Hour IX. Service Main Burners and Combustion Chamber LubricationBurner and Flueway Cleaning Differential Pressure Switch Settings Pilot Burner LocationAvoid Breathing Fiber Particulates and Dust Page Page Repair Parts Heat Exchanger AssemblyCanopy/Blower Assembly Cerafelt Gasketing not depictedPage Page Base Assembly Page Page Jacket Assembly Domestic Water Tank Assembly Miscellaneous Trim and Controls Vent Accessory Carton Air Intake TerminalLimited Warranty