I. Pre-Installation

WARNING

Carefully read all instructions before installing boiler. Failure to follow all instructions in proper order can cause personal injury or death.

A. Installation must conform to the requirements of the authority having jurisdiction. In the absence of such requirements, installation must conform to:

USA ANSI Z223.1, National Fuel Gas Code. Where required by the authority having jurisdiction, the installation must also conform to ANSI/ASME CSD-1Standard for Controls and Safety Devices for Automatically Fired Boilers.

CANADA CAN/CGA B149.1 or .2 Installation Codes for Gas Burning Appliances and Equipment, and CSA C22.1 Canadian Electrical Code, Part I.

B.Appliance is design certified for installation on combustible flooring. The boiler must not be installed on carpeting.

C.Provide clearance between boiler jacket and combustible material in accordance with local fire ordinance. Refer to Figure 2 for minimum listed clearance from combustible material. Recommended service clearance is 24 inches from left side, right side, front and rear. Service clearances may be reduced to minimum clearances to combustible materials.

D.Install on level floor. For basement installation provide concrete base if floor is not perfectly level or if water may be encountered on floor around boiler.

E.Protect gas ignition system components from water (dripping, spraying, rain, etc.) during boiler operation and service (circulator replacement, condensate trap, control replacement, etc.).

Figure 2: Minimum Clearances to Combustible Surfaces

4

Image 4
Contents Minuteman 81404025R13-1/07 Price $3.00Table of Contents Dimensional Drawing Pre-Installation Minimum Clearances to Combustible SurfacesIII. Water Piping and Trim II. Unpack BoilerDo not drop boiler. Do not bump boiler jacket against floor Page Internal Water Piping System Diagram IV. Domestic Hot Water Performance and Piping Domestic Hot Water RatingsGas Piping Rated InputFitting Equivalent Lengths Specific Gravity Correction FactorsVI. Venting / Air Intake Piping ComponentGeneral Guidelines Vent/Air Intake LengthInstall Vent Connector Burnham Vent System ComponentsInstall Vent Pipe, Burnham Gasket-Less Vent System Install Vent Pipe, GeneralInstall Vent Pipe, Burnham Gasketed Vent System Horizontal Through Wall Vent Installation Burnham Gasketed Vent Joint DetailRecommended Horizontal Vent Installation Vertical Through Roof Vent Installation Horizontal Vent Pipe Wall PenetrationVertical Vent Installation Install Air Intake PipeWiring Diagram VII. ElectricalVIII. System Start-up Do not install an automatic fill valve with this boilerPrepare to check operation Operating Instructions Adjust gas input rate to boiler Check Boiler High LimitGas Flow Rate in Cubic Feet per Hour IX. Service Main Burners and Combustion Chamber LubricationBurner and Flueway Cleaning Differential Pressure Switch Settings Pilot Burner LocationAvoid Breathing Fiber Particulates and Dust Page Page Repair Parts Heat Exchanger AssemblyCanopy/Blower Assembly Cerafelt Gasketing not depictedPage Page Base Assembly Page Page Jacket Assembly Domestic Water Tank Assembly Miscellaneous Trim and Controls Vent Accessory Carton Air Intake TerminalLimited Warranty