Bunn SNG0033000 manual Nothing Pressed, Servers?

Page 37

PROGRAMMING THE BREWER (cont.)

SERVICE TOOLS (cont.)

NOTE: The tank heater will automatically turn off if left on too long.

26.After testing the tank heater, press NEXT to advance to the next test.

27.The HEATER CONTACTOR is used only on certain models. Check the machine schematic to see if the contactor is present. Connect a voltmeter across a tank heater that is operated by the contactor and press ON to check that correct voltage is present. Press OFF and confirm the voltage is zero.

28.Press NEXT to return to TEST OUTPUTS.

29.To exit SERVICE TOOLS, press and release the ON/OFF switch (either on DUAL brewers) located on the front switch panel. This will return to the

MAIN SCREEN.

Procedure to test switches:

This function allows the operator to test the opera- tion of the individual switches on the front panel.

1.Place brew funnel(s) into rails on the brewer (both sides on DUAL brewers).

2.Place a Soft Heat server(s) beneath the brew funnel(s).

3.Press and hold the upper right hidden switch until display reads UNITS. Release the switch. Continue to press and release switch until SERVICE TOOLS appears.

4.Press YES to run tests on various components and outputs within the brewer. (Pressing NO will exit this function and advance to the next function screen.)

5.The display should read TEST OUTPUTS.

6.In TEST OUTPUTS screen, press NO. This advances to TEST SWITCHES.

7.Pressing NO in this screen will advance to the next function. Press YES in the TEST SWITCHES screen to test the switches. The display will read

NOTHING PRESSED.

8.From this screen, press any of the switches on the front of the brewer except the upper right hidden switch. While the switch is pressed, the display shows the name of that switch. If the name does not appear, or if it remains after the switch has been released, the switch is defective. Each switch can be tested in this manner.

9.After all switches have been tested, press and re-

lease the right hidden switch (®). This will return to TEST SWITCHES?. Press and release switch again to advance to TEST SERVERS?. Another alternative is to press and release the ON/OFF switch (either on DUAL brewers) located on the front switch panel. This will exit TEST SWITCHES and return to the MAIN SCREEN.

Procedures to test servers:

This function allows the operator to test the opera- tion of the Soft Heat servers. It will also show if the server is correctly placed on the brewer stand.

1.Place brew funnel(s) into rails on the brewer (both sides on DUAL brewers).

2.Place a Soft Heat server(s) beneath the brew funnel(s).

3.Press and hold the upper right hidden switch until the display reads UNITS. Release the switch. Con- tinue to press and release switch until SERVICE TOOLS? appears.

4.Pressing NO will exit this function and advance to the next function screen. Press YES to run tests on various components and outputs within the brewer.

5.The display should read TEST OUTPUTS?

6.In TEST OUTPUTS screen, press NO. This ad- vances to TEST SWITCHES?. Press and release NO once more. The display should now read TEST

SERVER(S)?

7.Press YES in the TEST SERVER(S) screen to show if a server is in place. The display should read IN PLACE (with arrows pointing to the left and right on DUAL brewers).

8.Lift and pull both Soft Heat servers forward about 2 inches so that the two contacts on each server do not touch the two contacts on the brewer.

9.The display should then read SERVER REMOVED (with arrows pointing to the left and right on DUAL brewers).

10.After the server(s) have been tested, press and re- lease the ON/OFF switch (either on DUAL brewers) located on the front switch panel. This will exit TEST SERVERS and return to the MAIN SCREEN.

Procedures to test coil frequency:

1.Place brew funnels into rails on both sides of brewer.

2.Place a Soft Heat server beneath each brew fun- nel.

Page 37

41341 080108

 

Image 37
Contents Dual SH DBC BUNN-O-MATIC Commercial Product Warranty Introduction Glossary Programming Programming SwitchesScreen Programming Lockout Switch mounted on main control boardOutputs Main ScreenNot using a Smart Funnel and/or a G9-2T DBC or MHG Grinder Using a Smart Funnel and a G9-2T DBC or MHG GrinderRecipe Programing Methods RecipesContinue to LevelProgram Flow Diagram Program Flow Diagram Procedure for modifying units of measure Units Setting Units of MeasureNEW Recipe ? Enable EnergysavrSET NEW Recipe Procedure for Setting the RecipeSizes DONE? SET NEW RecipeSET NEW Recipes Procedure to program the coffee nameReview RECIPES? No YES Procedure for reviewing recipes Review RECIPES/MODIFY RECIPES/SET UP no Name Coffee FavorsReview Recipes WAS the Last RecipeBatches DONE? No YES Brew OZ Setting or Adjusting Brew VOL- UmesBypass Modifying pulse brew SET Pulse BrewSET Pulse Brew SET Pulse Brew Easy Pulse Setup TIMES? SET Pulse Brew Enter TimesDONE? Batches DONE? SET PreinfusionSetup Complete Procedure to modify drip timesDrip Time now displayed on non funnel lock units as well Reads Copy Settings Procedure to copy settingsAssign Recipes OnlyYOU SURE? Enable ADS?Are YOU SURE? SET TempSET Temp Procedure to set ready temperatureSET Ready Refill Range 20 toSpray OZ/M Single Brewers Procedure to adjust the flow rate settingSpray OZ/M Dual Brewers Bypass OZ/M Dual Brewers Bypass OZ/M Single BrewersCalibrate Flow Procedures to calibrate the sprayhead flow rateCalibrate Flow ? Brate Bypass .. Press Brew to Start Procedures to calibrate the bypass flow rateBrew Counters Procedures to view/reset the brew countersFunnel Detect Server DetectServer not in Place Service Tools Programming the Brewer SERVERS? Nothing PressedProcedure to set factory defaults Factory DefaultsTest FREQUENCY?