Bunn SNG0033000 manual Procedures to calibrate the sprayhead flow rate, Calibrate Flow ?

Page 31

PROGRAMMING THE BREWER (cont.)

CALIBRATE FLOW

This function allows the operator to enter the actual flow rate of the sprayhead and the bypass (for each side on DUAL brewers) by dispensing both separately for one minute. The volumes are then entered in ounces per minute (OZ/M).

Procedures to calibrate the sprayhead flow rate:

1.Place a container, accurately graduated in ounces, and with a minimum capacity of 60 ounces, beneath the funnel (on the side to be calibrated on DUAL brewers) on the brewer.

2.Press and hold upper right hidden switch until the display reads UNITS. Release switch. Continue to press and release switch until display reads

CALIBRATE FLOW ?.

3.Press and release YES to advance to the SPRAY HEAD CAL? function screen. (Pressing NO in the CALIBRATE FLOW screen will advance to the next function screen, BREW COUNTERS).

4.Press and release YES. The display should read CONTAINER READY? If the container is under the funnel, press YES. The display should read

CALIBRATE SPRAY .. PRESS BREW TO START.

5.Press and release the BREW switch (on the side to be calibrated for DUAL brewers). The display should read CALIBRATE SPRAY .. 60 SEC TO FIN- ISH. The 60 second timer on the display will count down to zero. When the counter reaches zero, the display will change to ENTER OZ, along with a number signifying ounces per minute.

6.Measure the amount of water in the container and using the (-)or (+), adjust the amount on the display to match the amount in the container. Then press DONE.

7.The display should now read:

NEW SPRAY FLOW (SINGLE brewers)

NEW L or R SPRY FLOW (DUAL brewers), along with the correct flow rate of the sprayhead in ounces per minute. After about 5 seconds, the display will return to the CALIBRATE FLOW screen.

8.Repeat steps 1 - 8 when calibrating the other side on DUAL brewers.

9.To exit the CALIBRATE FLOW program, press NO to advance to the next function screen, or press and release the ON/OFF switch (either on DUAL

brewers) located on the front switch panel to exit the CALIBRATE FLOW function and return to the

MAIN SCREEN.

 

 

CALIBRATE FLOW?

 

 

 

 

NO

YES

 

 

 

EXIT TO

 

 

 

 

NEXT FUNCTION

 

 

 

 

 

SCREEN

 

 

 

 

 

 

SPRAYHEAD CAL?

 

 

 

 

NO

YES

 

 

 

 

CONTAINER READY?

 

 

 

 

NO

YES

 

 

 

 

CALIBRATE SPRAY

 

 

 

 

PRESS BREW START

 

 

 

 

BREW PRESSED

 

 

COUNTS DOWN

CALIBRATE SPRAY

 

 

60 SEC TO FINISH

 

 

TO ZERO

 

 

 

 

 

 

 

 

AFTER 1 MINUTE

 

 

 

 

SINGLE

DUAL

 

 

 

 

BREWERS

BREWERS

 

 

 

 

Left or Right

 

 

OZ XX.X

 

LEFT OZ XX.X

(-)

DONE

(+)

(-)

DONE

(+)

 

 

 

L or R

 

 

NEW SPRY FLOW

NEW L SPRY FLOW

 

XX.X OZM

XX.X OZM

 

 

5 sec

 

 

5 sec

 

Page 31

41341 080108

 

Image 31
Contents Dual SH DBC BUNN-O-MATIC Commercial Product Warranty Introduction Glossary Programming Programming SwitchesMain Screen Programming Lockout Switch mounted on main control boardScreen OutputsRecipes Using a Smart Funnel and a G9-2T DBC or MHG GrinderNot using a Smart Funnel and/or a G9-2T DBC or MHG Grinder Recipe Programing MethodsContinue to LevelProgram Flow Diagram Program Flow Diagram Procedure for modifying units of measure Units Setting Units of MeasureNEW Recipe ? Enable EnergysavrSET NEW Recipe Procedure for Setting the RecipeSizes DONE? SET NEW RecipeSET NEW Recipes Procedure to program the coffee nameReview RECIPES? No YES WAS the Last Recipe Review RECIPES/MODIFY RECIPES/SET UP no Name Coffee FavorsProcedure for reviewing recipes Review RecipesBatches DONE? No YES Brew OZ Setting or Adjusting Brew VOL- UmesBypass Modifying pulse brew SET Pulse BrewSET Pulse Brew SET Pulse Brew Easy Pulse Setup TIMES? SET Pulse Brew Enter TimesDONE? Batches DONE? SET PreinfusionSetup Complete Procedure to modify drip timesDrip Time now displayed on non funnel lock units as well Only Procedure to copy settingsReads Copy Settings Assign RecipesSET Temp Enable ADS?YOU SURE? Are YOU SURE?Refill Range 20 to Procedure to set ready temperatureSET Temp SET ReadySpray OZ/M Single Brewers Procedure to adjust the flow rate settingSpray OZ/M Dual Brewers Bypass OZ/M Dual Brewers Bypass OZ/M Single BrewersCalibrate Flow Procedures to calibrate the sprayhead flow rateCalibrate Flow ? Brate Bypass .. Press Brew to Start Procedures to calibrate the bypass flow rateBrew Counters Procedures to view/reset the brew countersFunnel Detect Server DetectServer not in Place Service Tools Programming the Brewer SERVERS? Nothing PressedProcedure to set factory defaults Factory DefaultsTest FREQUENCY?