Ice-O-Matic GEM1256R, GEM0956R Water Reservoir, Bin Control, Bin Controls Ice Level Sensors

Page 39

GEM0650/0956/1256 Remote

R&R- Water Reservoir, Bin Control

Water Reservoir:

1.Disconnect electrical power supply.

2.Shut off water supply to the ice maker.

3.Remove the front panel.

4.Disconnect water inlet tube from reservoir inlet fitting.

5.To remove float valve, push in “locking tabs” as shown and pull float up. Note: The plunger/seat is available separately as a part.

6.To remove reservoir, pull up and remove water sensor.

7.Disconnect water outlet tubes.

8.Remove mounting screws from reservoir bracket, and remove reservoir from ice maker.

9.Reverse to reassemble.

Float Assembly

Locking Tabs

Ice Chute

Slide Bin

Controls to

Remove

Water

Sensor

Bin Controls (Ice Level Sensors)

1.Disconnect electrical power supply.

2.Remove the front panel.

3.Remove the control box cover.

4.Locate ice chute, at the base of the chute, in front of and behind it are two plastic bin control mounts.

5.Slide each bin control to the left, and disconnect the electrical leads connecting the bin control to the circuit board.

6.Reverse to reassemble, be certain that the bin controls are aligned so that the ice level sensors are visible (centered) through the holes in the ice chute.

Page 33

Image 39
Contents By Ice-O-Matic Pearl Ice SeriesPage Keep this manual for future reference IntroductionTable Of Contents Concealed Loss or Damage Freight Claim ProcedureInspect Promptly Visible Loss or DamageGoverning LAW WarrantyFor the Installer GEM0650/0956R GEM1256R Bin Application Ice Machine SpecificationsWater Limitations LocationStorage Bin Ice machineLine Sets ERC Dimensions Inches GRC1001 GRC1061 GCR2061Remote Condenser Pearl Ice NumberRemote Condenser Location Calculation FormulaCalculation Example Remote Condenser Location Roof AttachmentPrecharged Line Set Routing Typical Installation Final Connections Coupling Instructions Initial ConnectionsFor the Plumber Water InletDrains Ice Machine For the Electrician Completed Installation Final Check List Start Up There are no adjustments to make, so replace the panelsStart Up Pre-Start InspectionComponent Description Control Board GEM0650/0956/1256 Remote Electrical Sequence Water System Operation WaterWater Water LevelOperation Refrigeration Refrigeration SchematicLow Condensing Temperature Pump Down Operation Performance Sanitizing and Cleaning Brush in direction of fins Condenser MaintenanceBearing Maintenance Bearing MaintenanceSensor Maintenance Bin Control SensorWater Sensor Auger Auger MaintenanceSymptom Possible Cause Probable Correction Service DiagnosisSymptom High pressure cut out check Control System DiagnosticsWater Reservoir, Bin Control Water ReservoirBin Controls Ice Level Sensors Bearing and Breaker To Remove the Breaker Bearing AssemblyTo Remove the Auger AugerReplacing the Water Seal Water SealTo Remove the Water Seal Removal of the Water Seal To Replace the Water SealEvaporator To Replace the EvaporatorTo Reassemble the Evaporator and Auger To Inspect the Gear Motor To Remove and Repair the Gear Motor AssemblyGear Motor To Check the Gear MotorFan Blade and Motor To Remove the Condenser Fan Motor AssemblyCharging Procedure Refrigeration ServiceWiring Diagram GEM0650R GEM0650R Wiring DiagramWiring Diagram GEM0956R GEM0956R Wiring DiagramWiring Diagram GEM1256R GEM1256R Wiring DiagramWhat to Do Before Calling for Service Service History