Ice-O-Matic GEM1256R, GEM0956R, GEM0650R installation manual Bearing Maintenance

Page 33

GEM0650/0956/1256 Remote

Bearing Maintenance

Bearing Maintenance:

The bearing in the breaker should also be checked at least two (2) times per year.

Switch the machine OFF and check the bearing.

1. Remove the chute cover.

2.Unscrew the ice sweep

3.Removing the water shed and unscrewing the breaker cover.

Note: Left Hand Threads

4. Unscrewing the auger stud

5.Inspect the bearing. There should be plenty of grease in sight. If grease is needed the bearing and breaker should be removed to check the action of the bearing.

It should rotate freely.

6.To remove the breaker, remove the lower ice chute then take out all four (4) Allen head cap screws and pull the breaker off the auger and evaporator.

7.If the bearing only needs grease, inject grease into the bearing using a grease needle.

See Removal and Replacement Section to replace bearings and seals.

Page 27

Image 33
Contents By Ice-O-Matic Pearl Ice SeriesPage Keep this manual for future reference IntroductionTable Of Contents Inspect Promptly Freight Claim ProcedureVisible Loss or Damage Concealed Loss or DamageGoverning LAW WarrantyFor the Installer GEM0650/0956R GEM1256R Bin Application Ice Machine SpecificationsStorage Bin LocationIce machine Water LimitationsRemote Condenser ERC Dimensions Inches GRC1001 GRC1061 GCR2061Pearl Ice Number Line SetsRemote Condenser Location Calculation FormulaCalculation Example Remote Condenser Location Roof AttachmentPrecharged Line Set Routing Typical Installation Final Connections Coupling Instructions Initial ConnectionsFor the Plumber Water InletDrains Ice Machine For the Electrician Completed Installation Final Check List Start Up There are no adjustments to make, so replace the panelsPre-Start Inspection Start UpComponent Description Control Board GEM0650/0956/1256 Remote Electrical Sequence Water Operation WaterWater Level Water SystemOperation Refrigeration Refrigeration SchematicLow Condensing Temperature Pump Down Operation Performance Sanitizing and Cleaning Brush in direction of fins Condenser MaintenanceBearing Maintenance Bearing MaintenanceSensor Maintenance Bin Control SensorWater Sensor Auger Auger MaintenanceSymptom Possible Cause Probable Correction Service DiagnosisSymptom High pressure cut out check Control System DiagnosticsWater Reservoir, Bin Control Water ReservoirBin Controls Ice Level Sensors Bearing and Breaker To Remove the Breaker Bearing AssemblyTo Remove the Auger AugerTo Remove the Water Seal Water SealRemoval of the Water Seal To Replace the Water Seal Replacing the Water SealEvaporator To Replace the EvaporatorTo Reassemble the Evaporator and Auger Gear Motor To Remove and Repair the Gear Motor AssemblyTo Check the Gear Motor To Inspect the Gear MotorFan Blade and Motor To Remove the Condenser Fan Motor AssemblyCharging Procedure Refrigeration ServiceWiring Diagram GEM0650R GEM0650R Wiring DiagramWiring Diagram GEM0956R GEM0956R Wiring DiagramWiring Diagram GEM1256R GEM1256R Wiring DiagramWhat to Do Before Calling for Service Service History