Ice-O-Matic GEM0956R, GEM1256R Bearing and Breaker, To Remove the Breaker Bearing Assembly

Page 40

GEM0650/0956/1256 Remote

R&R-Bearing and Breaker

Note: Removal of the auger, water seal, evaporator and gear motor must begin at the top of the assembly.

To Remove the Breaker Bearing Assembly:

1. Disconnect electrical power.

2. Remove panels.

3. Push back bail clamp and remove ice chute cover.

4. Unscrew and remove ice sweep.

5. Lift up and remove ice chute.

6. The breaker may be removed from the auger and evaporator without disturbing the auger. a. Unscrew breaker cover from breaker (Note: Left Hand Threads)

b. Unscrew auger stud from top of auger. (Fig. 1)

c. Unscrew four (4) Allen head cap screws holding breaker to evaporator. (Fig 2)

d. Lift up, and remove breaker/bearing assembly from auger and evaporator. (Fig 3)

7.Service the bearing. Check for rust, rough spots and damage.

a.The bearing is pressed into the breaker, to remove the bearing and replace it, an arbor press is needed.

b.Replace lower seals before installing new bearing in breaker. Note: Seals must be pressed in with a tool pushing against the outer edge only, they will not install by hand.

c.Replace parts as required. Re-grease bearings with Ice-O-Matic PN6051062-01 bearing grease.

d.Replace top seal and check the O-Rings, replace if cut or torn.

8.Reverse to reassemble: Specific tools and materials are required to install properly.

a.Add food grade grease such as Ice-O-Matic PN6051036-01 to the seal area before installing on the auger.

b.Check the seal to shaft areas for cuts or rough spots, none are permitted.

Fig. 1

Fig. 2

Fig. 3

 

 

Bearing

 

Ice Sweep

Seals

Auger Stud

Breaker Cover

Page 34

Image 40
Contents Pearl Ice Series By Ice-O-MaticPage Introduction Keep this manual for future referenceTable Of Contents Freight Claim Procedure Inspect PromptlyVisible Loss or Damage Concealed Loss or DamageWarranty Governing LAWFor the Installer GEM0650/0956R GEM1256R Ice Machine Specifications Bin ApplicationLocation Storage BinIce machine Water LimitationsERC Dimensions Inches GRC1001 GRC1061 GCR2061 Remote CondenserPearl Ice Number Line SetsCalculation Formula Remote Condenser LocationCalculation Example Roof Attachment Remote Condenser LocationPrecharged Line Set Routing Typical Installation Coupling Instructions Initial Connections Final ConnectionsWater Inlet For the PlumberDrains Ice Machine For the Electrician Completed Installation Final Check List There are no adjustments to make, so replace the panels Start UpPre-Start Inspection Start UpComponent Description Control Board GEM0650/0956/1256 Remote Electrical Sequence Operation Water WaterWater Level Water SystemRefrigeration Schematic Operation RefrigerationLow Condensing Temperature Pump Down Operation Performance Sanitizing and Cleaning Condenser Maintenance Brush in direction of finsBearing Maintenance Bearing MaintenanceBin Control Sensor Sensor MaintenanceWater Sensor Auger Maintenance AugerService Diagnosis Symptom Possible Cause Probable CorrectionSymptom Control System Diagnostics High pressure cut out checkWater Reservoir Water Reservoir, Bin ControlBin Controls Ice Level Sensors To Remove the Breaker Bearing Assembly Bearing and BreakerAuger To Remove the AugerWater Seal To Remove the Water SealRemoval of the Water Seal To Replace the Water Seal Replacing the Water SealTo Replace the Evaporator EvaporatorTo Reassemble the Evaporator and Auger To Remove and Repair the Gear Motor Assembly Gear MotorTo Check the Gear Motor To Inspect the Gear MotorTo Remove the Condenser Fan Motor Assembly Fan Blade and MotorRefrigeration Service Charging ProcedureGEM0650R Wiring Diagram Wiring Diagram GEM0650RGEM0956R Wiring Diagram Wiring Diagram GEM0956RGEM1256R Wiring Diagram Wiring Diagram GEM1256RService History What to Do Before Calling for Service