Jackson AJ-44 technical manual AJ-80CE/CEL Models, AJ-80CS/CSL Models, D226 Steam Booster

Page 12

SECTION 1: SPECIFICATION INFORMATION

ELECTRICAL REQUIREMENTS (CONTINUED)/D226 STEAM BOOSTER PARAMETERS

AJ-80CE/CEL MODELS

 

 

 

 

TYPICAL

VOLTS

 

 

TOTAL

ELECTRICAL

PH

HZ

AMPS

CIRCUIT

208

3

50

68 A

90 AMP

220

3

50

62 A

80 AMP

230

3

50

63 A

80 AMP

380

3

50

34 A

45 AMP

415

3

50

25 A

35 AMP

440

3

50

22 A

30 AMP

208

1

60

91 A

125 AMP

230

1

60

84 A

110 AMP

200

3

60

53 A

70 AMP

208

3

60

54 A

70 AMP

230

3

60

50 A

70 AMP

380

3

60

34 A

45 AMP

460

3

60

25 A

35 AMP

600

3

60

22 A

30 AMP

AJ-80CS/CSL MODELS

 

 

 

 

TYPICAL

 

 

 

TOTAL

ELECTRICAL

VOLTS

PH

HZ

AMPS

CIRCUIT

208

3

50

19 A

25 AMP

220

3

50

19 A

25 AMP

230

3

50

19 A

25 AMP

380

3

50

7 A

15 AMP

415

3

50

8 A

15 AMP

440

3

50

8 A

15 AMP

208

1

60

19 A

25 AMP

230

1

60

19 A

25 AMP

200

3

60

13 A

20 AMP

208

3

60

13 A

20 AMP

230

3

60

13 A

20 AMP

380

3

60

13 A

20 AMP

460

3

60

7 A

15 AMP

600

3

60

8 A

15 AMP

NOTE: Always refer to the machine data plate for specific electrical and water requirements. The material provided on this page is for reference only and may be subject to change without notice.

D226 STEAM BOOSTER

ELECTRICAL REQUIREMENTS:

 

VOLTAGE (V)

200-230

FREQUENCY (HZ)

50/60

PHASE

SINGLE

WATER REQUIREMENTS:

 

INCOMING WATER TEMPERATURE (MINIMUM)

110°F

FLOW PRESSURE (PSI)

20±5

STEAM REQUIREMENTS:

 

INCOMING STEAM PRESSURE (PSIG)

15-25

HEAT EXCHANGER SPECIFICATIONS:*

 

TUBESIDE WORKING PRESSURE (PSI)

125

SHELLSIDE WORKING PRESSURE (PSI)

125

TUBESIDE HYDROSTATIC TEST PRESSURE (PSI) 250

SHELLSIDE HYDROSTATIC TEST PRESSURE (PSI)

 

188

MAXIMUM OPERATING TEMPERATURE

295°F

MAXIMUM SHELLSIDE STEAM PRESSURE (PSI) 125

*- Indicates typical design criteria but is subject to change without notice. For more information, contact you authorized Jackson service representative.

STEAM RELIEF VALVE SET PRESSURE (PSI):

50

WATER OUTLET SAFETY VALVE SET PRESSURE (PSI): 125

AJ-44C Series Technical Manual 7610-001-76-22

Issued: 03-21-2006 Revised: N/A

4

Image 12
Contents For Jackson Models AJ-66CELAJ-44CGP AJ-66CGP AJ-66CSLManufacturers Warranty ONE Year Limited Parts & Labor WarrantyStop Pare Arret Revision Made Applicable Details Date ECN AJ-44CSL Nomenclature for the Models Covered in this ManualTable of Contents Parts Parts Section Side Loader SectionD226 Steam Booster Section Electrical Schematics Viii Maintenance & Repair CentersSection Specification Information Specification Information AJ-44CE/CEL Models AJ-66CE/CEL ModelsAJ-44CGP Models AJ-66CGP ModelsAJ-80CE/CEL Models AJ-80CS/CSL ModelsD226 Steam Booster Specification Information AJ-44 Electric Left to Right Left to RightRight to Left AJ-44Information to Right Information AJ-44 GAS Right toLeft AJ-44 Steam Left to RightSpecification Information AJ-44 Steam Right to Left Specification Information AJ-66 Electric Left to Right Left to RightSpecification Information AJ-66 Electric Right to Left Right to LeftSpecification Information AJ-66 GAS Left to Right Left to Right AJ-66 GAS Right toAJ-66 Steam Left to Specification Information AJ-66 Steam Right to Left Right to LeftLeft to Right Specification Information AJ-80 Electric Right to Left Specification Information AJ-80 GAS Left to Right Left to RightRight to Left AJ-80 GAS Right toAJ-80 Steam Left to Recommended Table FabricationSpecification Information AJ-80 Steam Right to Left Right to LeftSide Loader Left to Right Dimensions Section A-ASide Loader Right to Left Dimensions Side Loader Installed Dimensions D226 Steam Booster Dimensions D226 Steam Booster Plumbing Line Drawings Typical Electric and GAS Booster Dimensions Rear ViewSection Installation & Operation Instructions INSTALLATION/OPERATION Instructions Installation InstructionsIncoming Power Connection Detergent Connection Point Machine rear view Deliming Operations Preparation Changing the AJ-44CE/CS Direction of TravelINSTALLATION/OPERATION Instructions Removing the bracket nut INSTALLATION/OPERATION Instructions INSTALLATION/OPERATION Instructions Special Parts Please refer to the chart for placement of the curtains Side Loader Installation & Operation Instructions Equipment Mounting PlumbingShutdown for Service only OperationGAS Conveyor Hose Installation Conveyor Hose Installation GASDishmachine Operating Instructions Dishmachine Operation Instructions Changing Dual Sanitization Mode Drive Mechanism Maximum Speed AdjustmentOrange background Detergent Control Striker Plate Limit Switch Installation Instructions Installation InstructionsSection Preventative Maintenance Preventative Maintenance Preventative MaintenanceD226 Maintenance Maintenance of the Water Pressure RegulatorLubrication Chart for Drive Gear SHC-90WDrive Motor Gear Reducer Preventative Maintenance Lubrication & MaintenanceSection Troubleshooting Section Troubleshooting Common ProblemsTorque Settings Items Torque SpecD226 Common Problems Problem Power light does not illuminate
Related manuals
Manual 8 pages 11.95 Kb