Jackson AJ-44 technical manual Special Parts

Page 47

SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS

CHANGING THE AJ-44CE/CS DIRECTION OF TRAVEL (CONTINUED)

Conveyor Switch Chart:

Unit

Switch #1

Switch #2

Switch #3

Direction

 

 

 

Left to Right

Wash Switch

Wash Switch

Rinse Switch

 

#1

#2

 

 

 

 

 

Right to Left

Rinse Switch

Wash Switch

Wash Switch

#2

#1

 

 

The chart above lists the conveyor switches and their func- tions, depending on the direction of travel for the machine. As you can see, when you change the direction of the conveyor, you must also alter the way the conveyor switches operate.

There is no need to remove the switches, only to change the wiring inside the heater box.

Terminal board inside the heater box

34.Note: Before beginning any part of this maintenance evo- lution that deals with the wiring of the machine, ensure that it is performed by qualified technicians only. Always refer to the machine schematic, located inside the control box, for any questions.

Wash Switch #1 and the Rinse Switch need to have their wire positions changed on the terminal board pictured above. Locate the gray/yellow wire for Wash Switch #1 (do not con- fuse it with the gray/yellow wire for Wash Switch #2) and the orange/yellow wire for the Rinse Switch. Exchange their posi- tions on the terminal board.

35.Verify that the plumbing has been reassembled correctly and that the hole cover weldment has been replaced and none of the gaskets are torn or pinched as this could lead to leaking when the machine operates.

35.Re-install the heater box cover.

SPECIAL PARTS

Gasket, Rinse Injector:

Mfg. No.: 05330-111-42-81

Incoming plumbing assembly for a Left to Right machine

(note hole cover weldment in lower right corner)

Incoming plumbing assembly for a Right to Left machine

(note hole cover weldment in upper left corner)

AFTER MAINTENANCE ACTIONS

1.Reconnect the incoming water and drain lines and then restore power to the unit. Run the unit for at least 1/2 hour to ensure there are no leaks. Test the unit with an empty rack to ensure that it pulls the rack all of the way through the unit. If any problems arise you can contact your Jackson rep- resentative.

2.Replace the front dress panel once the unit is ready for service again.

SPECIAL NOTES

1.There is a possibility that you may be required to shorten or lengthen the conduit and wire lengths for the inlet solenoid on the rinse plumbing once it is moved. This work should be performed by qualified technicians who will do the work according to applicable local, state and national codes. Questions concerning this should be directed to your Jackson representative.

AJ-44C Series Technical Manual 7610-001-76-22

Issued: 03-21-2006 Revised: N/A

39

Image 47
Contents AJ-66CSL For Jackson ModelsAJ-66CEL AJ-44CGP AJ-66CGPONE Year Limited Parts & Labor Warranty Manufacturers WarrantyStop Pare Arret Revision Made Applicable Details Date ECN Nomenclature for the Models Covered in this Manual AJ-44CSLTable of Contents D226 Steam Booster Section Parts Parts SectionSide Loader Section Viii Maintenance & Repair Centers Electrical SchematicsSection Specification Information Specification Information AJ-66CGP Models AJ-44CE/CEL ModelsAJ-66CE/CEL Models AJ-44CGP ModelsD226 Steam Booster AJ-80CE/CEL ModelsAJ-80CS/CSL Models Left to Right Specification Information AJ-44 Electric Left to RightAJ-44 Right to LeftInformation to Right Left InformationAJ-44 GAS Right to Right AJ-44 Steam Left toSpecification Information AJ-44 Steam Right to Left Left to Right Specification Information AJ-66 Electric Left to RightRight to Left Specification Information AJ-66 Electric Right to LeftSpecification Information AJ-66 GAS Left to Right AJ-66 GAS Right to Left to RightAJ-66 Steam Left to Right to Left Specification Information AJ-66 Steam Right to LeftLeft to Right Specification Information AJ-80 Electric Right to Left Left to Right Specification Information AJ-80 GAS Left to RightAJ-80 GAS Right to Right to LeftRecommended Table Fabrication AJ-80 Steam Left toRight to Left Specification Information AJ-80 Steam Right to LeftSection A-A Side Loader Left to Right DimensionsSide Loader Right to Left Dimensions Side Loader Installed Dimensions D226 Steam Booster Dimensions D226 Steam Booster Plumbing Line Drawings Rear View Typical Electric and GAS Booster DimensionsSection Installation & Operation Instructions Installation Instructions INSTALLATION/OPERATION InstructionsIncoming Power Connection Detergent Connection Point Machine rear view Deliming Operations Changing the AJ-44CE/CS Direction of Travel PreparationINSTALLATION/OPERATION Instructions Removing the bracket nut INSTALLATION/OPERATION Instructions INSTALLATION/OPERATION Instructions Special Parts Please refer to the chart for placement of the curtains Side Loader Installation & Operation Instructions Plumbing Equipment MountingOperation Shutdown for Service onlyGAS Conveyor Hose Installation GAS Conveyor Hose InstallationDishmachine Operating Instructions Dishmachine Operation Instructions Drive Mechanism Maximum Speed Adjustment Changing Dual Sanitization ModeOrange background Detergent Control Installation Instructions Striker Plate Limit Switch Installation InstructionsSection Preventative Maintenance Preventative Maintenance Preventative MaintenanceMaintenance of the Water Pressure Regulator D226 MaintenanceSHC-90W Lubrication Chart for Drive GearLubrication & Maintenance Drive Motor Gear Reducer Preventative MaintenanceSection Troubleshooting Section Common Problems TroubleshootingItems Torque Spec Torque SettingsProblem Power light does not illuminate D226 Common Problems
Related manuals
Manual 8 pages 11.95 Kb