SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS (CONTINUED)
Mount all dispensing equipment at back of machine or on adjacent wall. Do not mount equipment on top or front of machine.
A fuse block is provided and located at the rear of the control box for electrical power connec- tion and will provide line voltage (208/230V) during sixty (60) second time cycle. Properly rated fuses must be installed into fuse block for power connection. Install dispensing equipment power leads to fuse block in control box. Route wires to fuse block through 1/2” conduit hole provided in rear of control box. Install properly rated fuses not to exceed 2.5 ampere.
NOTE: This fuse block will provide constant power during sixty (60) second time cycle.
Fuse block location
WARNING: DO NOT MAKE ANY ELECTRICAL CONNECTIONS TO ANY INPUT OR LOAD CIRCUITS OF SOLID STATE TIMER OR ELSEWHERE IN CONTROL BOX OR TO SOLENOID OR MOTOR WIRING. CONSULT FACTORY FOR FURTHER INFORMATION.
PLUMBING CHECK: Slowly turn on the water supply to the machine after the incoming fill line and the drain line have been installed. Check for any leaks and repair as required. All leaks must be repaired prior to placing the machine in operation.
ELECTRICAL POWER CONNECTION: Electrical and grounding connections must comply with the applicable portions of the National Electrical Code ANSI/NFPA 70 (latest edition) and/or other electrical codes.
Disconnect electrical power supply and place a tag at the disconnect switch to indicate that you are working on the circuit.
The dishmachine data plate is located on the right side and to the front of the machine. Refer to the data plate for machine operating requirements, machine volt- age, total amperage load and serial number.
To install the incoming power lines, open the control box. This will require taking a phillipshead screwdriver and removing the four (4) screws on the sides of the control box. Install 3/4” conduit into the
USE COPPER
CONDUCTORS ONLY
1 | 2 | 3 |
L | L | L |
Power Block Connection
GND
Ground Lug
VOLTAGE CHECK: Ensure that the power switch is in the OFF position and apply power to the dishmachine. Check the incom- ing power at the terminal block and ensure it corresponds to the voltage listed on the data plate. If not, contact a qualified ser- vice agency to examine the problem. Do not run the dishmachine if the voltage is too high or too low. Shut off the service break- er and mark it as being for the dishmachine. Advise all proper personnel of any problems and of the location of the service breaker. Replace the control box cover and tighten down the screws.
200 Series Technical Manual
7