Jackson 200S, 200LT False panel positioned in unit, Parts Section False Panel Installation

Page 53

SECTION 6: PARTS SECTION

FALSE PANEL INSTALLATION

Front False Panel 05700-001-29-39

Front False Panel Kit with Hardware

05700-021-30-39

Rack rail removed & reposi- tioned for a corner operation.

Insert this side first.

False panel positioned in unit.

1.Loosen the rack assembly from the unit.

2.False panel will mount to the rack; inside the dishmachine.

3. Position panel in unit on side to be closed.

4.Hold panel against side of dishmachine and push up.

5.Panel will clip inside the unit under the edge of the hood.

6.Holes in false panel willl ine up with rack assembly holes.

7.Re-install screws for rack assembly which will secure false panel to unit.

8.Re-assemble the rack track in an “L” shape for a corner opera- tion.

Bottom of side panel.

200 Series Technical Manual

7610-100-45-00 Rev. E (02/10/2006)

48

Image 53
Contents Steam Heated Models Technical ManualPage Revision Made Applicable Details Date ECN Nomenclature for the Models Covered in this Manual 200 NBII. INSTALLATION/OPERATION Instructions Table of Contents Section Description SpecificationsVII Electrical Diagrams DRAWING/PARTS SectionSection Specification Information Operating Cycle Seconds TemperaturesTank Capacity Gallons Wash Pump CapacityTOP View Specification Information DimensionsCorner Conversion TOP View Front Front ViewTable Dimensions Specification InformationSection INSTALLATION/OPERATION Instructions Raise Lower Frame with Adjustable Foot GND INSTALLATION/OPERATION Instructions Detergent Control INSTALLATION/OPERATION Instructions Operation Instructions INSTALLATION/OPERATION Instructions Operation Instructions Section Preventative Maintenance Preventative Maintenance Section Troubleshooting Section Problem Dishmachine will not run. No power to the unit Troubleshooting Section Common ProblemsProblem Water temperature is less than required Section Service Procedures Steps Service Procedures Rinse Solenoid Valve Repair Parts KITPreparation Tools RequiredPrying open the coil wire cover Removing the valve bonnet Special Parts After Maintenance ActionsSet the cap to the side Service Procedures Vacuum Breaker Repair Parts KITRemoving the plunger Service Procedures Rinse Regulating Thermostat Replacement Service Procedures Rinse Regulating Thermostat Replacement Tightening the brass fitting Contact Information Special NotesSection Parts Section Jackson Parts Section Control BOX AssemblyQTY Description Parts Section Hood Assembly Single Piece Weldment Parts Section Cantilever ARM/DOOR Assemblies Parts Section See page Entitled Wash HEATERS/RINSE Heaters Parts Section TUB AssemblyTub Weldment Not used on 200S Parts Section Rinse Tank Assembly 200B Rinse Heater 12 KW Parts Section Wash HEATERS/RINSE HeatersModel Volts Phase Wash Motor Assembly Parts Section Motor AssemblyParts Section Frame Assembly Parts Section Incoming Fill PLUMBING/OUTLET Plumbing Water Pressure Regulator KIT Wprk Option Plumbing Complete Vacuum Breaker Assembly Parts Section Coil Assembly 200S Parts Section Incoming Steam Plumbing Assembly 200S Parts Section Wash & Rinse ARM/MANIFOLD Assemblies Exploded View of Wash & Rinse Spindle Assembly Parts Section Safety Door Interlock SDI Option Parts Section Exhaust FAN Control Option FAN Load on Timer OutputFalse panel positioned in unit Parts Section False Panel InstallationSection Electrical Schematics 200/200B/200LT 208-230-460V, 50/60 HZ, Single & Three Phase Electricalschematics200S 208-230-460V, 50/60 HZ, Single & Three Phase