
Shim as |
|
|
required |
|
|
to make |
|
|
level with |
|
|
center |
|
|
console |
|
|
(front |
| Jack |
and back) |
|
|
4"x4" or larger |
|
|
(front and back) |
|
|
Skid | Flanged feet | Forklift tongs |
Recommended Installation Procedure
MOVING UNIT
1.While still on skid, move unit as close to final installation position as possible.
2.Prepare unit for lifting as shown in diagram.
3.Lift gently with a forklift or jacks and remove skid.
4.Lower gently to ground and remove forklift and blocking.
5. If unit has to be
LEVELING | Note: Instructions reflect a more complicated twin mixer kettle - process for single mixer kettles is the same. | |||||
|
|
|
|
| ||
|
|
|
| B | 3. | Level consoles individually from front to back |
B |
|
|
|
| (dotted lines C). Adjustments are made by turning | |
|
|
| A |
| ||
|
|
|
| flanges on front feet only. | ||
A |
|
|
|
|
| |
|
|
|
| 4. | ||
|
|
|
|
| ||
|
|
|
|
|
| and then the front (dotted line D). Adjust if |
|
|
|
|
|
| necessary. |
C | C | C |
|
|
| 5. Check that mixer bridge is level and |
|
|
| C | C |
| guide pins lock smoothly without |
|
|
|
| binding. If not repeat steps 1 through 4. | ||
| C |
|
|
| ||
|
|
|
|
| ||
D |
|
|
| D | Guide Pins | |
|
|
|
| |||
|
|
|
|
|
| |
|
|
|
|
| NOTE: See Operating Instructions before | |
|
|
|
|
| operating unit. | |
|
|
|
|
| 6. Make electrical connections (see electrical | |
|
|
|
|
|
| service connections) and test mixer bridge as |
Recommended Leveling Procedure |
|
|
| follows: |
1.With
2.Level and
⇒A/ Raise mixer bridge.
⇒B/ Swing bridge out over centre console.
⇒C/ Swing bridge to the left as far as possible.