Sierra Monitor Corporation HRG010-W, HRG015-W Specifications, Communication Cable Wiring

Page 34

HRX-OM-J049-A

Chapter 3 Transport and Installation

„Procedures for communication cable wiring installation (RS485) HRG010-W-C / HRG015-W-C (communication feature-laden option)

The communication cables are to adhere to specifications shown below.

Table 3-3 Communication Cable

 

Item

Specifications

Communication cable

Size

Shielded twisted-pair wire (0.75mm2)

Y-shaped crimp contact size

1.25Y-3

 

1. Connect the power cables properly, as shown below.

Communication cable

 

Signal cable access

Front

(communication cable access)

Fig. 3-11 Communication Cable Wiring

2. Have the converters listed below available. Establish connection with the computer (with a RS232C terminal).

Table 3-4 Converter (Example)

Item

Specifications

RS232C RS485 converter

Part number: KS-485

Manufacturer: System Sacom

 

Connecting connector

D-sub 9-pin (male)

 

 

Computer Converter coupling cable

Part number:AR-305

Manufacturer: Arvel

 

3.2 Installation

HRG010-W HRG015-W

3-12

1st edition : Aug. 2006

Rev. A: May. 2007

Image 34
Contents Water-refrigerated Thermo cooler To the Customers Table of Contents Startup and Shutdown Error Message and TroubleshootingChapter Unit Maintenance Chapter DocumentsTOC-3 TOC-4 Safety Instructions Before Using this Unit„ Serious injury Level of riskDefinitions of Serious injury and Minor injury „ Minor injurySymbols Classification of risks „ High temperature hazardsHazard Warning Label „ High voltage hazardsType of hazard warning labels Model label Location of hazard warning labelSafety Measures Safety Precautions„ For handling circulating fluid „ For system transportation, installation and removalProtective equipment „ For system operationEmergency Measures Thermo Cooler OFFRecovery of refrigerant and compressor oil Disposition of WasteCirculating fluid disposal Material Safety Data Sheet MsdsSystem disposal Safety Instructions Appearance and Each Section AppearanceName of Each Section 1 HRG010-W2 HRG015-W Name of Each Section HRG015-WControl panel Name FunctionTransport and Installation TransportTransporting with forklift and unit lifting Forklift Insertion Position and Unit LiftingTransporting with caster „ HRG010-W-A / HRG015-W-A caster-mounted optionInstallation Installation conditionsInstallation location Installation location and maintenance work area Recommended Installation LocationInstallation „ Procedure for InstallationHRG010-W-A / HRG015-W-A Caster-mounted Option „ Power supply cable and Gfci breaker Electrical wiring HRG010-W HRG015-W „ How to conduct wiring Removal of Front Panel„ Electrical wiring diagram HRG015-WSpecifications 11 Communication Cable WiringPiping „ How to install piping„ Pipe diameter Name Size HRG010-W HRG015-W „ Recommended piping installationName Qty Supply of circulating fluid Open the supply valve laid with pipesReinstallation of unit „ Disconnection of power supply cableStartup and Shutdown Pre-checkSetting of circulating fluid temperature Power supplyPreparation for startup „ TS switch pump manual operation switch Additional water supplyStarting the unit Unit Startup and ShutdownStopping the unit Check at startup „ Bypass valve„ Bypass relieving valve piping set Error Message Troubleshooting Error MessageTroubleshooting See 5.3 Alarm Reset for error recoveryAlarm Reset Alarm Lamp OFF „ Error checkUndo the screws 6 pcs. to remove the front panel „ When the alarm lamp goes out by performing steps 1. to Location of Reset Switch RS Yellow ButtonRecovery from Power Failure Power Lamp on „ Power error checkUndo the screws 6 pcs. to remove the front panel Switch off the earth leakage breaker once Control of Water Quality Unit MaintenanceSubstances Facility water Circulating fluid spec Spec Inspection and Cleaning Inspection item Daily inspectionInspection method Quarterly inspection „ Replacement of circulating fluid„ Cleaning of facility water Biannual inspection„ Antifreeze of circulating fluid Check during wintertime„ Antifreeze function automatic pump operation Long-term Storage ConsumablesPart number Qty Remarks Standard Specifications DocumentsHRG010-W HRG015-W „ Gfci breaker Optional Specifications„ Caster „ CommunicationOutline Dimensions 2 HRG010-W-A, HRG015-W-AElectric Circuit 1 HRG010-W, HRG015-W2 HRG010-W-BC, HRG015-W-BC Electric Circuit HRG010-W-BC, HRG015-W-BCFlow Chart „ HRG010-W, HRG015-WThermo Cooler HRG010-W / WRG015-W Daily Inspection Sheet IN/OUTProduct Warranty