Chapter 4 Startup and Shutdown

Chapter 4 Startup and Shutdown

Personnel with adequate knowledge and experiences of this product and peripheral devices shall be in charge of starting up and shutting down the unit.

4.1 Pre-check

Check the following items before starting up the unit.

4.1.1Installation condition

zMake sure the unit is installed horizontally.

zDo not put any heavy object on the unit or apply excess force by piping.

4.1.2Electric wiring

Check that the power cable, ground and I/O signal cables are correctly connected.

4.1.3Facility water piping

Check the I/O piping of the facility water is installed correctly.

4.1.4Piping for circulating fluid

Check the I/O piping of the circulating fluid is installed correctly.

4.1.5Supply of circulating fluid

Check the fluid level is within the specified range shown on the level indicator.

HRG010-W HRG015-W

4.1 Pre-check

1st edition : Aug. 2006

4-1

Rev. A: May. 2007

Image 39
Contents Water-refrigerated Thermo cooler To the Customers Table of Contents Chapter Documents Error Message and TroubleshootingChapter Unit Maintenance Startup and ShutdownTOC-3 TOC-4 Before Using this Unit Safety Instructions„ Minor injury Level of riskDefinitions of Serious injury and Minor injury „ Serious injurySymbols „ High voltage hazards „ High temperature hazardsHazard Warning Label Classification of risksType of hazard warning labels Location of hazard warning label Model labelSafety Precautions Safety Measures„ For system operation „ For system transportation, installation and removalProtective equipment „ For handling circulating fluidThermo Cooler OFF Emergency MeasuresDisposition of Waste Recovery of refrigerant and compressor oilMaterial Safety Data Sheet Msds Circulating fluid disposalSystem disposal Safety Instructions Appearance Appearance and Each Section1 HRG010-W Name of Each SectionName of Each Section HRG015-W 2 HRG015-WName Function Control panelTransport Transport and InstallationForklift Insertion Position and Unit Lifting Transporting with forklift and unit lifting„ HRG010-W-A / HRG015-W-A caster-mounted option Transporting with casterInstallation conditions InstallationInstallation location Recommended Installation Location Installation location and maintenance work area„ Procedure for Installation InstallationHRG010-W-A / HRG015-W-A Caster-mounted Option Electrical wiring „ Power supply cable and Gfci breakerHRG010-W HRG015-W Removal of Front Panel „ How to conduct wiringHRG015-W „ Electrical wiring diagram11 Communication Cable Wiring Specifications„ How to install piping Piping„ Pipe diameter „ Recommended piping installation Name Size HRG010-W HRG015-W Name Qty Open the supply valve laid with pipes Supply of circulating fluid„ Disconnection of power supply cable Reinstallation of unitPre-check Startup and ShutdownPower supply Setting of circulating fluid temperaturePreparation for startup Additional water supply „ TS switch pump manual operation switchUnit Startup and Shutdown Starting the unitStopping the unit „ Bypass valve Check at startup„ Bypass relieving valve piping set Error Message Error Message TroubleshootingSee 5.3 Alarm Reset for error recovery Troubleshooting„ Error check Alarm Reset Alarm Lamp OFFUndo the screws 6 pcs. to remove the front panel Location of Reset Switch RS Yellow Button „ When the alarm lamp goes out by performing steps 1. to„ Power error check Recovery from Power Failure Power Lamp onUndo the screws 6 pcs. to remove the front panel Switch off the earth leakage breaker once Unit Maintenance Control of Water QualitySubstances Facility water Circulating fluid spec Spec Inspection and Cleaning Daily inspection Inspection itemInspection method Biannual inspection „ Replacement of circulating fluid„ Cleaning of facility water Quarterly inspectionCheck during wintertime „ Antifreeze of circulating fluid„ Antifreeze function automatic pump operation Consumables Long-term StoragePart number Qty Remarks Documents Standard SpecificationsHRG010-W HRG015-W „ Communication Optional Specifications„ Caster „ Gfci breaker2 HRG010-W-A, HRG015-W-A Outline Dimensions1 HRG010-W, HRG015-W Electric CircuitElectric Circuit HRG010-W-BC, HRG015-W-BC 2 HRG010-W-BC, HRG015-W-BC„ HRG010-W, HRG015-W Flow ChartIN/OUT Thermo Cooler HRG010-W / WRG015-W Daily Inspection SheetProduct Warranty