WARNING: CO2 displaces oxygen. Strict attention must be observed in the prevention of CO2 (carbon dioxide) gas leaks in the entire CO2 and soft drink system. If a CO2 gas leak is suspected, particularly in a small area, immediately ventilate the contaminated area before

attempting to repair the leak. Personnel exposed to high concentration of CO2 gas will experience tremors which are followed rapidly by loss of consciousness and suffocation.

1.Fully close (clockwise) CO2 cylinder valve.

2.Slowly loosen CO2 regulator assembly coupling nut allowing CO2 pressure to escape, then remove regula- tor assembly from empty CO2 cylinder.

3.Unfasten safety chain and remove empty CO2 cylinder.

WARNING: To avoid personal injury and/or property damage, always secure CO2 cylinder in an upright position with safety chain to prevent it from falling over. Should the shutoff valve become accidentally broken off, CO2 cylinder can cause serious personal injury.

4.Position CO2 cylinder and secure with safety chain.

5.Make sure gasket is in place inside CO2 regulator coupling nut, then install regulator on CO2 cylinder.

6.Open (counterclockwise) CO2 cylinder valve slightly to allow lines to slowly fill with gas, then open valve fully to back-seat valve. (Back-seating valve prevents leakage around valve shaft).

7.Check CO2 connections for leaks.

REPLENISHING BEER SUPPLY

(see Figure 2)

1.Close CO2 and beer line shutoff valves for the empty beer keg.

2.Remove beer keg tapper from the empty beer keg.

3.Make sure beer keg tapper and top of the full beer keg are clean, then then install tapper in the keg.

4.Open CO2 and beer line shutoff valves.

QUAD RING 183294-000

BALL 183296-000

SPRING 183297000

RETAINER 183298000

BODY 183295000

*Quad ring seal must be replaced each time check valve is serviced.

FIGURE 7. CO2 GAS CHECK VALVE

569000246

22

Image 28
Contents Installation Manual This Document Contains Important InformationTable of Contents Table of Contents cont’d Safety Information Recognize Safety InformationPage This page Left Blank Intentionally Warranty Reference Information General InformationGeneral Description Design DataTheory of Operation Universal Beer DispenserFlow Diagram Page This page Left Blank Intentionally Unpacking and Inspection InstallationSelecting Location Installation Fill Water Tank and Start Refrigeration SystemConnecting Beer Source Supplies to Unit Connecting CO2 System to Beer KEG TappersPreparing Unit for Operation Unit Operation OPERATOR’S Instructions Proper Beer StorageOperating Controls Daily PRE-OPERATION CheckCooling Unit Maintenance AdjustmentsOperating Clearances Cleaning and Sanitizing Cleaning CO2 System GAS Check ValvesReplenishing CO2 Supply Replenishing Beer SupplyPage This page Left Blank Intentionally Service and Maintenance Adjusting CO2 RegulatorsPreparing Unit for SHIPPING, RELOCATING, or Storing Periodic InspectionDispenser Components Parts Identification Unit Maintenance Cleaning Condenser Coil Beer Faucet AdjustmentCleaning Water Tank Checking ICE Water BathSanitize Beer Systems Replenishing CO2 Supply CO2 GAS Check Valve Cleaning CO2 GAS Check Valve Wiring Diagram Troubleshooting Temperature TOO Warm Rate TOO HighOFF-TASTE Beer Sour UnpalatableCoolant Sufficiently Installation Section Compressor does notOperate Compressor will notCompressor not RefrigerationOperating Warranty One Cornelius Place Anoka, Minnesota 612 800