Marathon RJ-88SC Optional Loading Configurations, Thru-The-Wall, Security Chute, Doghouse

Page 12

 

1 OPERATION

 

 

DECAL PLACEMENT for RJ-88SC, RJ-100SC, RJ-250SC,

or RJ-250VL

1-10

 

 

OPTIONAL LOADING CONFIGURATIONS

06-0039

 

 

 

 

THRU-THE-WALL

 

06-0039

 

 

 

 

 

SECURITY CHUTE

 

 

 

 

DOGHOUSE

 

 

 

 

 

 

 

 

 

06-0039

06-0040

EACH INSIDE WALL

EACH OUTSIDE WALL

06-0039

 

06-0039,

 

06-0052

 

DOCK

ACCESS GATE & HOPPER

Image 12
Contents Play IT Safe Contents Operation IntroductionSpecifications Side ViewWastec PRE-OPERATION Instructions Only Authorized Personnel Should be Allowed InsideKeyed Start Switch Reverse Operator StationEmergency Stop Control Description for 88SC, 100SC, & 250SC Control Description for 250VLCase of Emergency Operating Instructions for RJ-250VL Manual Override Instructions RAM Stop Rear only RJ-250VLOptional Controls Decals for RJ-88SC, RJ-100SC, RJ-250SC, or RJ-250VL Remote Power Unit Optional Loading Configurations Dock Access Gate & HopperTHRU-THE-WALL Security ChuteHydraulic Tailgate HT Units Rear ViewMaintenance LOCK-OUT & TAG-OUT InstructionsPeriodic Maintenance Procedures Pressure SettingPressure Settings Relief SettingRAM Control Timer Adjustment Printe D Circuit Board Locate D I N Motor Control PanelMULTI-CYCLE Timer Adjustment Option Warranty and Service on MotorsCylinder Removal Instructions RAM Stop Forward OptionStandard System Operating CHARACTERISTICS, 5 hp & 10 hp Principles of OperationTailgate Seal Replacement Front ViewDoor Seal on Door Section A-ACharts Timer SettingsFuses and Circuit Breakers Wire Sizes Length SizeParts List Part DescriptionMotor Control Panel Typical Power Unit Standard 5 HP Power Unit Standard 10 HP Hydraulic Schematic Typical TROUBLE-SHOOTING Chart Problem Cause SolutionPump Makes NOISE-SOUNDS Concrete PAD Requirements Concrete PADContainer Guides Steel Installation Procedures Dock InstallationCHUTE-FED Installation DecalsElectrical & Hydraulic Installation Remote Power Pack InstallationPushbutton Operator Station Electrical ConnectionsSTART-UP Instructions THROUGH-THE-WALL Power Unit Installation Power UnitTOP View Compactor Hauler Instructions General See the Next page for Door and Latch Operation InstructionsHauler Instructions DOOR/LATCH Operation Auto RelatchLatch Side View Container For Optional HT Units Instructions for Using Maintenance BAR Body Between the Tailgate and the ContainerHauler Instructions Liquid Removal For Optional SL Units