Alliance Laundry Systems CHM1772C manual Drain Connection, Drain Trough

Page 42

Installation

Drain Connection

Figure 23 and Figure 24 show typical drain trough and drain line installations.

Connect the drain outlet to a vented drain system using only a flexible connection. The drain system must be vented to prevent an air lock or siphoning.

Use the supplied black rubber adapter and clamps to transition from the machine drain outlet to the 2 inches schedule 40 PVC plumbing (20 and 30 models) and the 3 inches schedule 40 PVC plumbing (40, 60, 80 and 125 models).

If proper drain size is not available or practical, a surge tank is required. A surge tank along with a sump pump should be used when gravity drainage is not possible, such as in below-ground-level installations.

DRAIN TROUGH

 

3

 

 

 

 

 

2

 

 

 

4

 

 

1

 

7

 

 

5

 

 

 

CHM2058N

 

 

6

CHM2058N

 

 

 

 

 

 

CHM2058N

1

Drain Hose

5

Floor

2

Drain Valve

6

Open Drain Trough

3

Overflow Hose

7

1 in. Minimum Gap

4

Drain Tee

 

 

Figure 23

DRAIN LINE

2

1

1Drain Hose

2Drain Valve

3Drain Tee

*Drain line must be vented to meet local plumbing codes.

45*

3

CHM2335N6

CHM2335N

4Overflow Hose

5Vent Pipe*

6Trap (as required by local codes)

Figure 24

40

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

F8208301

Image 42
Contents Washer-Extractors Page Contents Explanation of Safety Messages Important Safety InstructionsSafety Information Safety Decals Operator Safety Do not bypass any safety devices in the machineModel Identification ModelIntroduction Pound 125Delivery Inspection Nameplate LocationCN040GC2OUID01 Introduction Model Number Familiarization GuideReplacement Parts Customer ServiceSpeed Models Specification Weight and Shipping Information Wash Cylinder InformationDrive Train Information Power ConsumptionEstimated Building Heat Load Cylinder SpeedsElectrical Heating Optional Number of motors in drive train Drive motor power, hp kW Electrical Heating Specifications and Dimensions Specifications and Dimensions Machine Capacity Dimensions 92 in 252 mm 94 in 202 mm Dimensional Clearances Machine Capacity Dimensional Clearances Dimensions 125Machine Foundation Minimum Depth Methods RequirementMinimum Floor Load Data, 2 Speed Models Specification Floor Load Data, Variable-Speed Models Specification 125Concrete Foundation Installation 20, 30, 40 and 60 ModelsInstallation Models Machine Anchoring Direct-to-Finished-Floor InstallationAnchor Specifications Refer to Figure Ft.- lbsElevated Base Frame Installation Completed expansion bolt installation is shown in FigureP035I Mounting Bolt Hole Locations Without Elevated Base Frames ModelsFront of Frame 19 mm 45 mm 660 mm 32 mm 41.5 1054 mm 1219 mm Mounting Bolt Hole Locations With Elevated Base Frames CHM2072N 92 mm 56 mm Drain Connection Drain TroughDrain Information 125 Drain Line Sizing Minimum Drain ID Model Number of MachinesNumber Supply Line Size Machines Water Connection RequirementsCabinet Hardmount Water Supply Information Hot/ColdElectrical Installation Requirements Input Power Conditioning Input Power Condition Corrective ActionCircuit Breakers and Quick Disconnects Connection SpecificationsInput Voltage Requirements GroundingPhase Adder Thermal Overload ProtectorInstallation Electrical Specifications Pound Capacity Models Standard Electric Heat380 440 200 208 Variable-Speed Models 380-415 440-480 200 208-240 10.0 380 50/60 10.0 Steam Supply Information Steam Requirements Steam Heat Option OnlySupply Dispensing Supply DispensingExternal Supplies Connection of External Liquid Supplies 20 80 Pound OPL ModelsStart Up Basket Rotation
Related manuals
Manual 19 pages 8.07 Kb