3Com 7000 manual Perform and 20 to verify LECS order

Models: 7000

1 150
Download 150 pages 23.75 Kb
Page 40
Image 40
24Perform step 19) and 20) to verify LECS order.

40CHAPTER 4: INSTALLING AND CONNECTING COREBUILDER MODULES

This item could be done through the LMA but it is preferred to do so through the NMS since the LMA will not show any redundant LES that exists.

22Reboot the switch using the LMA menu sequence: (1) SYS / (7) RBO. The purpose of this step is to make the second card active in order to check the LANE services there.

23After the second switch module boots, verify connectivity with the NMS station as in step 8).

24Perform step 19) and 20) to verify LECS order.

25Open the Backbone and Services Select window again and use it to check the LECS database is correct.

The hardware and LANE redundancy procedure is finished.