8e6 Technologies ER3-200 (5K02-56), ER3-100 (5K02-55), ERH-100 (5K02-61) Install the Unit

Models: ERH-200 (5K02-24) ER3-200 (5K02-56) ERS-100 (5K02-51) ERS-200 (5K02-52) ERH-100 (5K02-61) ER3-100 (5K02-55)

1 74
Download 74 pages 30.79 Kb
Page 67
Image 67
Install the Unit

Appendix: SAN Installation

Install the Unit

Link the ER Unit with the SCSI Connected Device

This sub-step is a continuation from the Storage Device Setup (for Attached Storage Units) portion of Step 1A or 1B in the ER section. The procedures outlined in this step require the use of the CAT-5E crossover cable and the Ultra SCSI 160 cable.

A.Plug the SCSI cable into the upper right slot on the back of the ER unit (see Figure 1, Item A).

B.Plug one end of the CAT-5E crossover cable into the ER unit’s LAN 2 port—the port on the right (see Figure 1 Item B for non-“H” units, and Figure 2 Item B for “H” units).

Figure 1: Back of the non-ER “H” unit

Figure 2: Back of the ER “H” unit

C.Plug the other end of the SCSI cable into the storage device’s upper left disk “0” (zero) channel (see Figure 3 Item A).

Figure 3: Back of the Nexsan SATABoy

8e6 Enterprise Reporter Quick Start Guide

63

Page 67
Image 67
8e6 Technologies ER3-200 (5K02-56), ER3-100 (5K02-55) Install the Unit, Link the ER Unit with the SCSI Connected Device