Installing the ICX-250

System Basics

9

Rack Mounting

The chassis comes with brackets for rack mounting. The installation site for rack mounting should provide proper room for ventilation and cable routing. Provide at least 2 inches of clearance between each ICX-250 unit to allow for removal of the top if necessary for resetting of switches.

1RWH￿ Check all grounding instructions when installing the ICX-250 unit in a rack. Proper grounding is mandatory at all times.

Center Mount

Data Loop 2

FXS Channel Status

 

 

 

 

 

 

 

 

 

 

1

3

5

7

9

11

13

15

17

19

21

23

 

Lcl. Off Net.

 

2

4

6

8 10

12

14

16

18

20

22

24

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flush Mount

The following figure depicts a 19” rack mount configuration.

Issue 1, September 1998

ADCP-62-023

© 1998, ADC Telecommunications, Inc.