ADT Security Services 200 Plus manual Daily Operating Schedules, System Programming cont’d

Models: 200 Plus

1 88
Download 88 pages 36.01 Kb
Page 43
Image 43
Daily Operating Schedules

System Programming (cont’d)

4.Press Daylight to display “Spring Daylight” description and programmed date.

5.Press Previous or Next to toggle between “Spring Daylight” description and “Fall Daylight” description and the date you want to change.

6.Press Change to display the selector buttons for entering a new spring or fall description.

7.Press Continue to display current and new date entry field.

8.Using the operating panel’s numeric keypad, enter the new date. Example: April 9th is entered 0409.

9.Press Enter to complete your entry and display the new date.

10.Press Quit to display the previous screen. Repeat steps 5 to 9 for the second date.

11.Press Quit to display the Time Selection Menu.

Daily Operating Schedules

Your FOCUS 200 PLUS system can accommodate two distinct daily operating schedules (two opening times and two closing times) for each day of the week for each Burglary (BA) group. Daily operating schedules may be used to restrict access to the facility and/or system. Users who have not been assigned “open regular” privilege will be denied access (key or card access control) or will trip an irregular opening alarm if a BA group is turned off outside the schedules or on holidays. These schedules also enable your system to automatically alert the ADT Customer Monitoring Center if the burglary protection was turned on at the proper time. Your system can also accommodate schedule limits, which prevent schedule changes that are outside the schedule limits.

43

Page 43
Image 43
ADT Security Services 200 Plus manual Daily Operating Schedules, System Programming cont’d