Protect PV.500-MH Operating Instructions

5

System Function

26

5.1

Description of Sequence Control

26

5.1.1

The "OFF" Status

26

5.1.2

The "Waiting for Feed Conditions" Status

26

5.1.3

The "Operation" Status

27

5.1.4

The "Waiting" Status

27

5.1.5

The "Fault" Status

28

5.1.6

The "Night" Status

28

5.1.7

Sequence Control During the Course of the Day

28

5.1.8

Sequence Control Parameters

30

5.2

Description of Fan Control

31

5.2.1

General

31

5.2.2

Fan Control, Cabinet Fan

31

5.2.3

Cabinet Fan Control Parameters

32

5.2.4

Fan Control, Inverter Stack Fan

32

5.2.5

Parameters of Inverter Stack Fan Control

33

5.3

Insulation Monitoring and Earthing of PV Cells

33

5.3.1

General

33

5.3.2Operation With Monocrystalline or Polycrystalline Solar Cells 35

5.3.3

Operation with Thin-Film Solar Cells

35

5.3.4

Insulation Monitoring Parameters

36

5.4

MPP Tracker

36

6

Monitoring Systems, Messages and Faults

37

6.1

General Information

37

6.2

Table of Faults

38

7

Interfaces

42

7.1

Communication Interface

42

7.1.1

General

42

7.1.2

Technical Data

43

7.1.3

Structure of the MultiCom CCC Interface

44

7.1.4

Configuration

47

7.1.4.1 Configuration Preparations

48

7.1.4.2 Configuring the Modbus Protocol

50

7.1.4.3 Configuring Modbus Data Transmission

51

7.2

COM Server

52

7.2.1

General

52

7.2.2

Network Connection

52

7.2.3

Structure of the COM Server (internally wired to A93)

52

7.2.4

Installation of the COM Server

53

7.2.5

Network Integration Configuration

54

7.2.6

Configuration of the Virtual COM Port

54

7.3

Remote Signalling

55

4 of 68

80000043212 BAL

Page 4
Image 4
AEG PV.500-MH manual System Function, Monitoring Systems, Messages and Faults, Interfaces