Preparing the Analyzer for Use
To change the RF section’s fuse
The fuse is installed at the factory to match the most commonly used line voltage in the country of destination.
1Unplug the power cord from the RF section (the section with “Agilent 89431A” silk screened on its lower left rear panel).
2Using a small screw driver, pry open the power selector cover.
3Pull the white fuse holder out of the power selector and remove the fuse from the fuse holder.
4Select the proper fuse and place in the fuse holder.
| AC Line Voltage | Selector |
|
| Fuse | |
RF Section | Range | Frequency | Agilent Part | Type | ||
Switch | Number |
| ||||
Agilent 89431A | 100 | 3 A 250 V Slow Blow | ||||
Agilent 89431A | 120 | 3 A 250 V Slow Blow | ||||
Agilent 89431A | 220 | |||||
Agilent 89431A | 240 | 1.5 A 250 V Slow Blow |
1Align the white arrow on top of the fuse holder with the white arrow on the power selector cover. All three arrows should point in the same direction. Push the fuse holder into the top slot of the power selector.
2Close the power selector by pushing firmly on the power selector cover.
3Check that the correct line voltage appears through the power selector cover.