Preparing the Analyzer for Use
6Set the RF section’s rear panel and front panel power switches to on.
Press the ‘’l‘’ symbol end of the
symbol end of the switch. The
7Set the IF section’s power switch to on.
Press the ‘’l‘’ symbol end of the
8Test the electrical performance of the analyzer using the operation verification or the performance tests in chapter 2, ‘’Verifying Specifications’’ in the Installation and Verification Guide.
The operation verification tests verify the basic operating integrity of the analyzer; these tests take about 2.5 hours to complete and are a subset of the performance tests. The performance tests verify that the analyzer meets all the performance specifications; these tests take about 5 hours to complete.