Allied Telesis AT-EN646, AT-iMG646PX-ON manual

Models: AT-iMG646PX-ON AT-EN646

1 98
Download 98 pages 34.36 Kb
Page 32
Image 32

Chapter 3: Installing the Enclosure

Required Tools and Supplies

Tools

Additional Supplies

The following tools and supplies are required to install the enclosure:

Have the following tools on hand before you install the enclosure or gateway:

ˆ3/8” drill

ˆDrill bit for the size of wall anchor or fastener you intend to use for the enclosure

ˆFlat head and #2 Phillips screwdrivers

ˆSM fusion splicer and required fiber handling tools

ˆ9/32 in. and 3/8 in. nut drivers

ˆPliers

ˆ5/32 hex security driver

You may also need the following supplies:

ˆMounting screws or bolts suitable for the mounting location and material.

ˆSilicone sealant

ˆElectrical tape

ˆA total of four UV-rated wire ties are recommended for the enclosure and gateway installation

ˆFiber cleaning materials

ˆOne 1m SC/UPC SM pigtail

ˆOne SM fusion splice protector

ˆOne earth ground rod, if not already present

ˆ#6 gauge solid copper ground wire

ˆConsole cable (AT-RGCONSOLECABLE)

ˆPower cable (AT-RG013-00)

ˆPower supply (AT-iMG005G)

32

Section I: Outdoor Installation

Page 32
Image 32
Allied Telesis AT-EN646, AT-iMG646PX-ON manual