Chapter 3: Installing the Enclosure

12.Tighten the Kepnuts on the strength member clamp to between 10 and 12 in-lbs to secure the strength members.

13.Replace the bar, washers, and Kepnuts on the posts of the drop cable clamp and tighten the Kepnuts to secure the cable, as shown in Figure 10, to between 10 and 12 in-lbs.

845

Figure 10. Drop Cable Secured to the Grounding Plate

Note

Make sure that the fiber optic cable is not secured by either clamp.

Installing the Ground Wire

The AT-iMG646 gateway must be connected to a good earth ground.

All Countries: Install product in accordance with local and

National Electrical Codes.  E8

To install the ground wire, perform the following procedure:

1.Prepare an adequate length of 14AWG stranded grounding wire for the ground connection.

1.Strip 0.25 in. (.635 cm) of insulation from the ground wire and crimp it into the ground wire ring lug (provided).

2.Remove the Kepnut from the ground wire post (see Figure 5 on page 35).

38

Section I: Outdoor Installation

Page 38
Image 38
Allied Telesis AT-EN646, AT-iMG646PX-ON manual Installing the Ground Wire