External Connection
800mm Battery Cabinet | 1000mm Battery Cabine | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.7.3 Mounting Batteries
WARNING!
Open front door of UPS and unscrew front cover.
Do not install battery drawers in UPS frame until all AC/DC sources are disconnected. Disconnect charging source prior to connecting batteries. Ensure that battery breakers F001 and F002 are set to position “off”.
WARNING!
Before proceding, ensure that power supplies have been disconnected from UPS for a minimum of 5 minutes.
Unscrew front frame of UPS and slide frame down as shown above.
Battery drawers may be installed after removal of front cover.
Installation Guide APC Silcon | 35 |