
Contents
1.0 | Introduction | 5 |
1.1 | Tools and Equipment | 5 |
2.0 | Unpacking | 6 |
3.0 | Installation | 8 |
3.1 | Requirements on Site | 8 |
3.1.1 | Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table: | 8 |
3.2 | Footprint | 10 |
3.2.1 | 600mm UPS Cabinet with 1xBP I or Isolation Transformer | 10 |
3.2.2 | 800mm UPS Cabinet with 1xBP I or | 10 |
3.2.3 | 1000mm Cabinet for | 11 |
3.2.4 | 600mm Cabinet for 40kW UPS without Batteries | 11 |
3.2.5 | 1000mm Cabinet for 40kW UPS with 2xBP I | 12 |
4.0 | External Connection | 13 |
4.1 | Connecting the UPS | 13 |
4.1.1 | Connecting the | 13 |
4.1.2 | Connecting the 40kW UPS | 15 |
4.2 | System Integration Interface | 17 |
4.2.1 | Connections | 18 |
4.3 | Parallel Board | 19 |
4.4 | Communication Interface Board | 22 |
4.4.1 | Connections | 22 |
4.5 | Connecting of APC Silcon Tripel Chassis | 23 |
4.6 | APC Silcon Triple Chassis | 24 |
4.6.1 | Safety Warnings | 24 |
4.6.2 | Product Description | 24 |
4.6.3 | Installing Management Peripherals | 25 |
4.6.4 | Powering the APC Silcon Triple Chassis | 27 |
4.6.5 | Troubleshooting | 28 |
4.6.6 | Product Specifications | 29 |
4.7 | APC Silcon Battery Cabinets | 32 |
4.7.1 | Cabinets | 33 |
4.7.2 | Preparing Batteries | 33 |
4.7.3 | Mounting Batteries | 35 |
4.7.4 | Final Checks | 37 |
4.7.5 | APC Silcon Battery Cabinets | 38 |
4.8 | Battery Breaker | 40 |
4.8.1 | Battery Breaker Box | 41 |
4.8.2 | Battery Breaker Box Connection Diagram | 42 |
4.8.3 | 43 | |
4.8.4 | 44 | |
4.8.5 | UPS with External Battery in Battery Breaker | 45 |
5.0 | Programming Parameters | 46 |
5.1 | Parameters | 46 |
5.1.1 | Programming Keys | 47 |
5.1.2 | Programming Example - Switch to Bypass Operation | 48 |
5.2 | System Configuration | 48 |
5.2.1 | Programming Example - Change Charge Voltage to 446 | 50 |
5.2.2 | Programming Example - Change to Output Isolation Transformer available | 51 |
5.3 | Programming Parameters for Advanced Parallel Operation | 52 |
5.3.1 | Description of Settings | 52 |
5.3.2 | Programming example | 53 |
5.4 | Battery Monitor | 53 |
5.4.1 | Installation of new batteries | 53 |
6.0 | Options/Accessories | 54 |
6.1 | Service Bypass Panel for Single Operation | 54 |
6.1.1 | Wiring up UPS with SBP in | 56 |
6.1.2 | Wiring up UPS with SBP in | 56 |
|
| |
|
| |
Installation Guide APC Silcon | 3 |