Installation and Operator’s Manual Page 4 of 63
(PVI-3600-OUTD-UK-F-W Rev.: 1.0)
USEFUL INFORMATION AND SAFETY STANDARD
FOREWORD
The installation of AURORA must be performed in full compliance with
national and local standards and regulations
AURORA has no internal user serviceable parts other than fuses.
For any maintenance or repair please contact the nearest authorized repair
center. Please contact your reseller if you need to know the nearest authorized
repair center.
Read and understand all the instructions contained in this manual and become
familiar with the safety symbols in the relevant paragraphs before you install
and commission the equipment
The connection to the distribution grid must be done only after receiving
approval from the distribution utility as required by national and state
interconnection regulations, and can be done only by qualified personnel.
Safety Brake the wind turbine to prevent any possibility of high voltages
appearing at the connecting cable terminations.
The AC disconnecting means must be opened before working on the Aurora
Wind inverters.
GENERAL
During inverter operation, some parts can be powered, some not properly insulated
and, in some cases, some parts can move or rotate, or some surfaces can be hot.
Unauthorized removal of the necessary protections, improper use, incorrect
installation or incorrect operation may lead to serious damage to people and
objects.
All transport, installation and start-up, as well as maintenance operations, shall be
carried out by skilled and trained personnel (all national regulations on accidents
prevention shall be complied with ! ! !).
According to these basic safety rules, qualified and trained people have skills for
the assembling, start-up and operation of the product, as well as the necessary
requirements and qualifications to perform such operations.
ASSEMBLY
Devices shall be assembled and cooled according to the specifications mentioned
in the corresponding documents.