Installation and Operator’s Manual Page 43 of 63
(PVI-3600-OUTD-UK-F-W Rev.: 1.0)
Sixth screen: Time during which the unit exported energy to the grid, and
number of times that unit connected to the grid.
Seventh screen: Daily energy and mode of operation of the inverter
In case the inverter is not working properly the Fault or Ground Fault LEDs will
turn on as described in paragraph 5.3, and the following three screens scroll on the
LCD remaining on for 5 seconds. They contain important information that should
be communicated to service personnel and will show cyclically on the LCD, each
for 5 seconds:
Timegrid hh:mm:ss
N
umg
r
id ##
E-Today ## Wh
ModeInverter OK