
Operators Manual
ALS 330/430
4.2 Inserting label material
Attention:
•Before threading the new material, the waste paper should be removed.
CAUTION! - Isertion/exchange of material should be carried out only by especially instructed personal.
Threading of the label material is shown down below on the threading diagrams for the
Left hand version | Right hand version | ||
|
|
|
|
|
|
|
|
Figure 7 Threading diagram
Release 4/06 | Page 24 | Operation |