INSTALLATION

DIP Switch Configuration Chart

 

DIP SWITCH #

 

BANK ADDRESS

1

2

3

4

 

 

 

 

 

 

DOWN

DOWN

DOWN

DOWN

BANK 00 (Default)

 

 

 

 

 

UP

DOWN

DOWN

DOWN

BANK 01 PRIMARY/SECONDARY

 

 

 

 

 

DOWN

UP

DOWN

DOWN

BANK 02 SECONDARY

 

 

 

 

 

UP

UP

DOWN

DOWN

BANK 03 SECONDARY

 

 

 

 

 

DOWN

DOWN

UP

DOWN

BANK 04 SECONDARY

 

 

 

 

 

UP

DOWN

UP

DOWN

BANK 05 SECONDARY

 

 

 

 

 

DOWN

UP

UP

DOWN

BANK 06 SECONDARY

 

 

 

 

 

UP

UP

UP

DOWN

BANK 07 SECONDARY

 

 

 

 

 

DOWN

DOWN

DOWN

UP

BANK 08 SECONDARY

 

 

 

 

 

UP

DOWN

DOWN

UP

BANK 09 SECONDARY

 

 

 

 

 

DOWN

UP

DOWN

UP

BANK 10 SECONDARY

 

 

 

 

 

UP

UP

DOWN

UP

BANK 11 SECONDARY

 

 

 

 

 

DOWN

DOWN

UP

UP

BANK 12 SECONDARY

 

 

 

 

 

UP

DOWN

UP

UP

BANK 13 SECONDARY

 

 

 

 

 

DOWN

UP

UP

UP

BANK 14 SECONDARY

 

 

 

 

 

UP

UP

UP

UP

BANK 15 SECONDARY

 

 

 

 

 

Example:

Four OmniView ENTERPRISE Quad-Bus Series KVM Switches (F1DW216C) are daisy-chained together to control 64 computers. The DIP switch on the primary units are set to “BANK Address 00” and “BANK Address 01” and the secondary units are each set to a unique BANK address between 02 and 15 (BANK 00 needs to be configured for daisy-chain operation, as noted above).

Installation

Before you begin:

1.Make sure that all computers and switches are powered off and that each Switch has been assigned a unique BANK address.

2.Place primary and secondary Switches in the desired locations.

13

Page 15
Image 15
Belkin F1DW216 user manual DIP Switch Configuration Chart, Example, Installation Before you begin