TROUBLESHOOTING (cont.)

 

 

 

Problem

Possible Cause

Troubleshooting Procedure

Equipment will not operate.

1.

No power or incorrect voltage.

Measure the voltage at the terminal

 

 

 

block and confirm that it matches

 

 

 

the voltage specified on the brewer

 

 

 

data plate within +/- 10%.

Brew cycle will not start.

1.

No water

Check plumbing and shut-off

 

2.

ON/OFF switch

valves

 

Test the ON/OFF switch. Refer to the

 

 

 

 

3.

Brew switch

switch test procedures.

 

Test the BREW switch. Refer to the

 

 

 

 

4.

Brew Valve

switch test procedures.

 

Test the Brew valve. Refer to Testing

 

 

 

 

5.

Electronic Control Board

Individual Components.

 

Substitute a control board known to

 

 

 

Automatic refill will not operate

1.

No water

be in good working order.

Check plumbing and shut-off

or display shows FILL TIME TOO

 

 

LONG

2.

Water strainer

valves.

(A) Direction of flow arrow must be pointing towards direction of water flow.

(B) Remove the strainer and check for obstructions. Clear or replace

Page 44

35879.1 071405

 

Page 44
Image 44
Bunn S/N SNG0033000 & UP manual Equipment will not operate No power or incorrect voltage, Data plate within +/- 10%