9.2.5 Verify Test Operation of Watt Hour Meter Follow these steps to display the watt hour meter monitor.
Watt hour Meter Monitor Function [Procedure]
1)Select the watt hour meter.
From the Charge Data Maintenance screen, select the meter to monitor using the “” button.
2)Click [Present Value Monitor] button.
Click the [Present Value Monitor] button. The Watt Hour Meter Current Integrated Value screen appears for the selected meter.
3)Click [OK] button.
When finished viewing these values, click the [OK] button.
When the [Monitor] button is clicked, the watt hour meter integrated value is monitored again.
Note:
•This screen can be used to verify the connection to the watt hour meters.
•The test operation integrated value may have a time lag of 10 seconds to 2 minutes.
•This function cannot be used for Without WHM connection proportionally divided electric charge.
•WHM test operation can be performed at the Management screen also. Refer to section 8.5 of the Management manual.
WHM No. select box
Charge Data Maintenance screen
Watt Hour Meter Current Integrated Value screen
9.3 Operation Amount Data Monitoring
When the operation amount data is monitored, it is possible to read the operation amount data for the indoor unit provided for each
<Description of function>
The system monitors the operation amount for the indoor unit from all the
Because of the reasons shown above, the Operation amount data monitor function is used to monitor the operation amount data as a guideline (cannot be monitored) with the date designated using the charge data maintenance described in 9.2 or the charging remedy described in 9.5 when the maintenance of the proportional division parameter value or the apportioned electric power is performed.
<Supplement> The
<Caution>
Even if the operation amount data is monitored, it may not be executable in some cases due to the following reasons:
•When the data has not accumulated due to a power shutdown for over 24 hours of the
•When the data has not accumulated due to setting the time/date of the
•When the
When the operation amount data is monitored by the system (2000 units) for one month, it takes approximately one hour.