Remedial apportioning setting screen

9.5.2 Remedial apportioning setting screen

(1)Check the items necessary for remedial apportioning.

When charging is not apportioned, the charging data is destroyed, etc., the air-conditioning charge can be calculated by a simple method.

The items which must be set depend on the assumed case and the charging configuration. The table below shows which setting items are required and are not required.

Assumed case

Charging configuration

Settlement- Total air - of-accounts conditioning

term

charge

Standard charge

Remedial

Power

apportioning integrated Remark

interVal

Value

 

 

HDD failure

1 system

(no backup)

Multiple systems

 

 

HDD failure

1 system

(backup)

 

Multiple systems

 

 

 

Computer crash

1 system

 

 

 

Multiple systems

Watt hour meter

1 system

failure (Monitoring

 

Multiple systems

i m p o s s i b l e )

 

 

 

System information

1 system

setting error

 

Multiple systems

 

 

 

 

 

 

 

 

 

V

 

V *1

V

V

See sec.

V

V

V *1

V

V

9.5.3

 

 

 

 

 

 

V

 

V *1

V

 

See sec.

 

 

 

 

 

9.5.4

V

V

V *1

V

 

 

 

 

 

 

 

 

 

V

 

V *1

V

 

See sec.

 

 

 

 

 

9.5.5

V

V

V *1

V

 

 

 

V

 

V *1

V

V *2

See sec.

 

 

 

 

 

9.5.6

V

V

V *1

V

V *2

 

 

 

 

 

 

 

V

 

V *1

V

V *2

See sec.

 

 

 

 

 

9.5.7

V

V

V *1

V

V *2

 

 

 

 

 

 

 

V shows that the item must be set.

*1 When the settlement -of-accounts term is 1 month, the standard charge can be set. MoreoVer, when remedial apportioning including the standard charge is not performed, it cannot be reflected in the air-conditioning charge result.

*2 The power integrated Value may haVe to be set depending on the failure cause or the contents of the setting error.

(2)Set the remedial apportioning setting items.

[Procedure]

1)Click [Remedial apportioning setting] button. Click the [Remedial apportioning] button in the initial window. The remedial apportioning setting screen appears.

2)Set the apportioning interval (Calculation).

Use click and the “/” buttons to set the interval to be calculated by this remedial apportioning. An interval from the previous day to the past 122 days can be set.

3)Set the total air-conditioning charge.

Set the settlement -of-accounts term total air-conditioning charge. When the standard charge is included, the total

air-conditioning charge also includes the standard charge for 1 month.

*Numbers can be manually input.

4)Select the standard charge setting.

When the settlement-of-accounts term is 1 month, whether or not the standard charge is to be included can be selected. Select [Include] or [Not include] with the option button.

5)Set the remedial apportioning interval.

Use click and the “/ ” buttons to set the remedial interval dates.

6)Set the power integrated value.

Displays the power integrated value at 00:00 hours of the remedial apportioning start day. (The integrated value at 24:00 hours of the previous day.) Select the field of the watt hour meter you want to change with the mouse and set or change the power integrated value. The integrated value field of the selected watt hour meter changes to a blue cell. When the integrated value data changes, the new data is displayed in blue.

64

Page 67
Image 67
Mitsubishi Electronics TG-2000A Remedial apportioning setting screen, Apportioning integrated Remark InterVal